![CommScope 3RU FPX Installation Instructions Manual Download Page 7](http://html1.mh-extra.com/html/commscope/3ru-fpx/3ru-fpx_installation-instructions-manual_2643777007.webp)
TECP-92-160 • Rev C • May 2018
Page 7
© 2018
CommScope
. All Rights Reserved.
2.3
Installing Vertical Cable Guides
Install the two Vertical Cable Guides (VCGs) on the panel as follows, referring to
1. Align the slotted mounting holes in the cable shield with the holes in the VCG mounting
bracket.
2. Align the holes in VCG with the holes in the cable shield and mounting bracket. Use 6-32
screws (2 per VCG, provided) to secure the VGC’s to panel.
Figure 5. Install VCGs (5RU Panel Shown)
VCG
MOUNTING
BRACKET
CABLE
S
HIELD
VCG
6-
3
2
S
CREW
S
(2 PLACE
S
)
IN
S
TALLED
VCG
25690-A