6
5
HOMEDEPOT.COM
Please contact 1-877-527-0313 for further assistance.
Installation (continued)
2
Selecting the Color Temperature
□
Use the CCT switch on the side panel of junction box to select warm white 2700K, soft white 3000K,
neutral white 3500K, bright white 4000K, or daylight 5000K.
4
Connecting the Wires
□
Place all wires and connections into the junction box and close the cover.
3
Connecting the Wires
□
Open the junction box (A) cover and remove the knockout on the side panel. If you are using a flexible metal
conduit remove the round knockouts. If you are using non metalic Romex cable, remove the rectangular knockout.
□
Insert the electrical supply cable through the knockout. Secure the cable in the knockout with a cable
clamp (not provided), if needed.
□
Connect the copper ground wire, the black wire and the white wire from the junction box to the same color
wires from the supply circuit. Secure wires using wire nuts (B).
Installation
1
Preparing the Installation Location
□
For remodel: Remove the existing recessed kit (trim, bulb and housing) from the hole.
□
For new construction: Use the template (D) provided to mark the desired installation location.
Use a drywall saw to cut the opening marked by the template.
Or
Or
2700K
3000K
3500K
4000K
5000K
AA: minimum 14.1 inch
BB: 0.2-1.0 inch
ceiling
Suitable for Type IC Ceiling Installation.
Suitable for through branch wiring.
AA
BB
Or
Summary of Contents for NK01aA11CR1259F
Page 5: ......