4
suspended installation
1
Mounting to drywall
□
Drill two 1/4in. holes in the ceiling to clear the closed flaps of the toggle bolt (not included).
□
Make sure to fasten the toggle bolt into the butterfly nut before inserting the flaps into the ceiling.
□
Tighten the toggle bolt.
Mounting to wood
□
Drill two 1/16 in. diameter pilot holes in the ceiling.
□
Make sure to fasten the combo wood-machine end into the metal hook.
□
Tighten the hook screw (not included) into the wood.
4
Optional suspending the fixture with chain.
□
Attaching the fixture light to the chain. Install one closed
loop of hanging chain (EE) to the metal “S” shaped hook
(FF) on the fixture body. Repeat this step on the other
side of the fixture.
□
Attaching the chain to the ceiling Hang the fixture body
by one chain set (EE, FF) over each hook (not included)
that has been installed on the ceiling. Adjust chains to
level light.
□
Insert the plug to the power socket, and turn on the
switch to activate the fixture.
3
Hanging the fixture
□
Hook the V clip (DD) on each end of the fixture to the metal
hooks installed in the ceiling.
note:
Product should be suspended using metal chain
or hooks with weight bearing capacity exceeding 11 lbs
(5 KG) and diameter within 6mm.
2
Installing the bracket and clip for
hanging
□
Insert the ends of the V clip (DD) into the openings in the U
bracket (CC).
□
Snap the U bracket (CC) onto the back of the fixture body
near one end.
□
Repeat the installation process for the U bracket (CC) and V
clip (DD) on the other end of the fixture body.
CC
note:
The distance between two holes is 800mm.
DD
DD
CC
FF
EE