2
Warnings & Safety Instructions
•
Installation & assembly work must be carried out by properly licenced
technicians or qualified trades people.
•
Incorrect installation can cause the CBMOWCOW-MT unit to fall and cause injury.
This company assumes no responsibility for injuries or damages that may occur
due to improper installation and handling.
•
The unit is designed for use with specific products and weight. Exceeding
maximum weight capacity to the moving frame may damage product and
equipment and could lead to serious personal injury.
•
Adhering to proper installation instructions is critical in ensuring all components
function properly. A small difference in installation can lead to a severely skewed and
distorted projection image. In order to obtain a square image without the use of
digital adjustment of the projector, follow the step by step instructions as shown.
•
Installation will require the lifting of heavy components. A minimum of two
people are required.
•
Fully tighten all mounting screws as specified in the installation
instructions. However, attachment points can be damaged if a power drill is used
to tighten screws. Screws should be turned by hand first before tightening with a hex key.
Do not over tighten screws. Check fasteners regularly to avoid parts becoming
loose.
•
Do not allow children to climb onto the frame.
•
Make sure cables are not caught between moving parts to ensure cables will not
be damaged. Cable tie all loose cables to avoid damage.
•
When the CBMOWCOW-MT is not in use, switch off the power source.
•
Make sure the fully raised height of the CBMOWCOW-MT does not exceed the
height of the building/room the CBMOWCOW-MT will be used in.