15
ROUTINE MAINTENANCE TABLE
OPERATION
MACHINE PART
PERIODICITY
Boiler steam blow-off -
Every day
The user
Visual control
Mac gun
---------------------------------------------------------
Electric parts
Every week
The user
Sealing of the water and steam con gun Every mont
The user
General cleaning
-
Every week
The user
SUPPLEMENTARY MAINTENANCE TABLE
OPERATION
MACHINE PART
PERIODICITY
Boiler cleaning
(disassemble the resistors and re-
move the limestone)
Every year
QUALIFIED TECHNICIAN
TROUBLES
CAUSES
SOLUTIONS
1 THE GENERATOR PRESSU-
RE DOES NOT INCREASE
- Resistance contactor
- Pressure switch
- Resistance
- Check the resistance contactor
- Check the pressure switch
- Check the resistance
2 THE PUMP CANNOT RUN
2.1 It loads no water
2.2 Sound allarm
2.3 It does not run
- The water tank is empty
- Pump
- Lack of water in the tank
- water solenoid valve
- Pump
- Water level probe
- Fill the tank
- Replace the pump
- Fill the tank
- Replace the pump
- Check and eventually replace it
- Clean the probe
3 THE SAFETY VALVE OPENS
REPEATEDLY
3.1 It keeps on
loading water
- Boiler water level probe
- Check the electronic level
- Pressure switch
- Resistance contactor
- Safety valve
- Clean the probe
- Replace it
- Replace the pressure switch
and check that the connection
copper tube is free from
incrustations.
- Replace the resistance contactor
- Replace the safety valve
WARNING :
Supplementary maintenance should only be carried out by a QUALIFIED TECHNI-
CIAN, following the table below (guideline only):
Summary of Contents for DSG-5 EX
Page 56: ...51 01 1 02 3 03 29 04 05 12 06 07 17 08 09...
Page 60: ...55 A B A C 1 2 3 1 ON 4 E 5 9 5 I J 1 K 2 3 1 OFF...
Page 61: ...56 8 8 3 12 8 0 5 1 8 8 2012 19 EU 2012 19 EU...
Page 62: ...57 1 2 2 1 2 2 2 3 3 3 1...
Page 84: ...79...
Page 85: ...80 cod 7 400 0241 Rev 00 02 2021...
Page 86: ......
Page 87: ......