COMELZ_ITALIA
COM52-INGL
9
6.3
ENVIRONMENT
•
Do not place the machine in rooms with explosion or fire hazard.
•
Shelter the machine from bad weather.
7
PREPARATION OF THE MACHINE FOR THE INSTALLATION
7.1
CLEANING AND INSPECTING
•
Make sure that the various components of the machine were not damaged during transportation and
handling.
•
Accurately clean the machine from dust and smearing substances, if any.
•
Make sure the machine lays flat on the floor. Level the machine through its adjustable foot, picture 6, if
necessary.
7.2
ELECTRICAL CONNECTION
•
Make sure the voltage and frequency values of the machine, indicated on a label on the back of the control
unit near the power supply cable input, picture 6, match those of the mains. Then connect the machine
through its cable.
The voltage of the machine is fixed and cannot be changed.
Important! The machine is single phase.
•
maximum electrical consumption
600 W
•
medium electrical consumption
350 W
•
allowed tension
+/- 10 of the rated voltage
7.3
OIL FILLING
•
Remove the cover, picture 6.
•
Fill the oil sump of the machine through the plug up to the mark on the oil window, picture 6.
The oil level must not exceed the red mark.
•
Use SAE10 viscosity lubricating oil.
8
INSTALLATION OF THE MACHINE
CONTROL MEMBERS AND THEIR FUNCTIONS
8.1
MAIN SWITCH, picture 6.
Press the I button to turn both the heating and
the whole electric system on.
8.2
START PEDAL, picture 6.
It controls the start of the machine and adjusts
its rotation speed.
8.3
CEMENT TOGGLE SWITCH,
picture 6.
It opens and closes cement flow.
8.4
CREASER FOOT LIFTING TOGGLE
SWITCH, picture 6.
It controls the lifting of the creaser foot, picture
13.
8.5
KNIFE ACTIVATION AND PITCH
REDUCTION PEDAL, picture 6.
•
Press it with the toe to activate feed pitch
reduction.
•
Press it with the heel to activate the snipping
knife.
8.6
CONSOLE
8.6.1
MEMORY, picture 7.
Picture 6