Comax AB105R Installation Manual Download Page 7

THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE 

MATTER THEREIN IS COMMUNICATED IN CONFIDENCE AND 

IS THE COPYRIGHT PROPERTY OF EUROPEAN SAFETY 

SYSTEMS LTD. NEITHER THE WHOLE OR ANY EXTRACT MAY 

BE DISCLOSED, LOANED, COPIED OR USED FOR 

MANUFACTURING OR TENDERING PURPOSES WITHOUT THEIR 

WRITTEN CONSENT.

DRAWING TO BS8888:2000

GEOMETRIC TOLERANCES TO ISO1101:1983

LINEAR DIMENSIONAL TOLS

ANGULAR DIMENSIONAL TOLS

STANDARDS

DATE

APPROVED

CHECKED

DATE

DATE

DRAWN

WEIGHT (Kg)

SURFACE FINISH

MATERIAL

ALTERNATIVE MATERIAL

SHEET

SCALE

TITLE

A3

IF IN DOUBT, ASK - 

DO NOT SCALE

ALL DIMENSIONS IN MM

DRAWING NUMBER

A

B

C

D

E

F

G

10

9

G

F

E

7

8

6

5

D

C

1

3

4

2

A

B

OF

NTS

R1

+

-

-

+

R1

+

-

-

+

S2

R1

+

-

-

+

S2

S3

OPTIONAL LINE MONITORING RESISTOR, CUSTOMER SUPPLIED,  

14V MAX SYSTEM = 120Ω MIN, 2W MIN OR 1KΩ MIN, 0.5W MIN

28V MAX SYSTEM = 470Ω MIN, 2W MIN OR 2.4KΩ MIN, 0.5W MIN

RECOMMENDED MINIMUM VALUES:

R1

Single Stage Configuration

Config.: 2a

Line Monitoring

Stage 1: Apply Power to Stage 1 -ve & Stage 1 +ve

Two Stage Configuration

             Config.: 2b

Common Positive

Stage 1: Apply Power to ve & Stage 1 -ve 

Stage 2: Apply Power to ve & Stage 1 -ve & connect 

Stage 2 -ve to Stage 1 -ve 

Three/Four Stage Configuration

      Config.: 2c

Common Positive

Stage 1: Apply Power to ve & Stage 1 -ve 

Stage 2: Apply Power to ve & Stage 1 -ve & connect 

Stage 2 -ve to Stage 1 -ve 

Stage 3: Apply Power to ve & Stage 1 -ve & connect 

Stage 3 -ve to Stage 1 -ve 

Stage 4: Apply Power to ve & Stage 1 -ve & connect 

Stage 2 -ve & Stage 3 -ve to Stage 1 -ve

DC configuration -Independent Sounder & Beacon Activation (Remove Link Wires)

MOD No.

REASON - INITIAL - DATE

ISSUE

-ve IN

+ve IN

R2

ve IN

ve OUT

Stage 1 -ve IN

Stage 1 -ve OUT

Stage 2 -ve

ve IN

ve OUT

Stage 1 -ve IN

Stage 1 -ve OUT

Stage 2 -ve

Stage 3 -ve

Stage 1 +ve IN

Stage 1 +ve OUT

Stage 1 -ve IN

Stage 1 -ve OUT

J.SPILLER

R.N.POTTS

11/06/2021

11/06/2021

11/06/2021

D118-06-001

INTRODUCTION

JS - 11/06/21

A

2

4

-ve IN

+ve IN

R2

AB105

R C

OMBINED SOUNDER & BEACON 

WIRING SHCEMATIC

Stage 2* -ve

-ve IN

+ve IN

R2

Stage 2* -ve

*Stage 2 not available for RTH beacon

*Stage 2 not available for RTH beacon

Summary of Contents for AB105R

Page 1: ...electric shock Attention D branchez le de la source d alimentation avant l installation ou l entretien pour viter tout choc lectrique Achtung Vor Installation oder Wartung von der Stromquelle trennen...

Page 2: ...UAL AB105R Default S2 Tone 1 Default S1 Tone 44 ON 1 OFF 0 AC DC See D221 95 001 N L DC See D118 06 001 AC See 118 06 001 S2 S3 S2 S1 S2 S1 N L E E S3 S2 N L Note Beacon pre wired as default Note Beac...

Page 3: ...screw clockwise remove the existing lens by rotat ing the lens to align with the unlock markings as shown below Replace the lens cover and rotate to the locked marking position Rotate the 1 off M4 po...

Page 4: ...INSTRUCTION SERVICE MANUAL AB105R 4x 1Nm 20mm If a high IP Ingress Protection rating is required then a suitable sealing washer must be fitted under the cable glands or blanking plugs...

Page 5: ...1 0 1 0 0 1 1 0 1 0 0 0 0 1 1 0 0 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 1 0 0 1 0 1 1 0 0 1 0 0 0 1 0 1 0 1 0 1 0 1 0 0 1 1 0 1 0 1 1 1 0 1 0 1 1 0 1 1 0 0 0 1 1 1 0 0 1 1 1 1...

Page 6: ...on Config 1a Line Monitoring Stage 1 Apply Power to Stage 1 ve Stage 1 ve Two Stage Configuration Config 1b Common Positive Stage 1 Apply Power to Common ve Stage 1 ve Stage 2 Apply Power to Common ve...

Page 7: ...age 1 ve Stage 1 ve Two Stage Configuration Config 2b Common Positive Stage 1 Apply Power to Common ve Stage 1 ve Stage 2 Apply Power to Common ve Stage 1 ve connect Stage 2 ve to Stage 1 ve Three Fou...

Page 8: ...9 G F E 7 8 6 5 D C 1 3 4 2 A B OF NTS 3 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED WIRING LINKING BEACON SOUNDER FACTORY FITTED 4 Single Stage Configuration Config 3a Stage 1 Apply Power to Stage...

Page 9: ...B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B R N POTTS OF NTS 4 SWITCHES FOR STAGE OPERATION CUSTOMER SUPPLIED 4 Single Stage Configuration Config 4a Stage 1 Apply Power to Stage 1 Live Stage 1 Neu...

Reviews: