InteliLite Global Guide
30
Mono phase application:
Connect CT according to following drawings. Terminals phase 2 and phase 3 are opened.
Image 4.4 Mono phase application
IMPORTANT: It is necessary to ensure that potential difference between current COM terminal and
power supply “-” terminal is maximally ± 2 V. There are 2 options how to ensure this:
"Red" option - properly ground both terminals
"Blue" option - interconnect these two terminals
Always apply only one option. Never realize both options on one installation.
Voltage measurement MRS wiring
There are 4 voltage measurement Connection Type (setpoint
[3Ph4Wire
/3Ph3Wire / Split Ph / Mono Ph]) options, every type matches to corresponding generator connection type.
Note:
For fusing of voltage measurement input use T1A or T2A fuse.
The generator protections are evaluated from different voltages based on
setting:
3Ph 4W – Ph-Ph voltage, Ph-N voltage
3Ph 3W – Ph-Ph voltage
SplPhL1L2 – Ph-N voltage
SplPhL1L3 – Ph-N voltage
Mono Ph – Ph-N voltage
Summary of Contents for InteliLite AMF25
Page 34: ...InteliLite Global Guide 34 ConnectionType SplPhL1L2 Image 4 11 Split phase L1L2 application ...
Page 36: ...InteliLite Global Guide 36 Image 4 14 Typical Split Phase generator wiring ...
Page 91: ...InteliLite Global Guide 91 Image 5 13 Flowchart of start of diesel engine ...
Page 93: ...InteliLite Global Guide 93 Image 5 14 Flowchart of start of gas engine ...
Page 721: ...InteliLite Global Guide 721 Image 9 34 IGS PTM Image 9 35 IGS PTM dimensions ...
Page 727: ...InteliLite Global Guide 727 Image 9 36 Inteli AIN8TC Image 9 37 Inteli AIN8TC dimensions ...
Page 731: ...InteliLite Global Guide 731 Image 9 38 Inteli AIO9 1 Image 9 39 Inteli AIO9 1 dimensions ...