IGS-NT-BC, SW Version 1.2.0,
©ComAp – January 2019
IGS-NT-BC-1.2.0 Reference Guide.PDF
138
ONLY but in addition to it all load shedding outputs are
closed when gen-set group goes to island operation.
For more information see the chapter
Load shedding
.
ALL
THE
TIME
Outputs are controlled by the load shedding function
regardless of breaker positions.
N
OTE
:
Learn more about load shedding in the separate chapter
Load shedding
.
Setpoint: Ld shed level
Group
Load shedding
Range [units]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used to adjust the relative load level (in % of
gen-set) for load shedding. When the relative load level exceeds this level for
more than
time the next load shedding output is closed.
N
OTE
:
Learn more about load shedding in the separate chapter
Load shedding
.
Setpoint: Ld shed delay
Group
Load shedding
Range [units]
0.0 .. 600.0 [s]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used to adjust time period the relative load level must be above
the
limit to close the next load shedding output.
N
OTE
:
Learn more about load shedding in the separate chapter
Load shedding
.
Setpoint: Ld recon level
Group
Load shedding
Range [units]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used to adjust the relative load level (in % of