12
Model WL60 Boiler Connection Ports
(Port, Quantity, NPT, Suggested Uses *)
A
(3)
1/2”
Water level glass, make-up water inlet
B
(4)
3/4”
Aquastats (water), Controllers (Steam), 750 LWC probe
C
(3)
1”
Relief Valve, pr./temp gauge
D (1) 1-1/4”
Relief
Valve
(alternate)
E
(4)
2”
Drains or Alternate Returns
F
(1)
2-1/2”
Optional 764, 767 LWC
G
(1)
3”
Primary return water or condensate
H
(1)
4”
Heated water or steam to application
I
(4)
1”
Optional tankless coil(s) w/boilers, std. w/CWH
Model L24 Boiler Connection Ports
(Port, Quantity, NPT, Suggested Uses *)
A
(3)
1/2 “
Water level glass, make-up water inlet
B
(3)
1/2"
Aquastats (water), Controllers (Steam), 750 LWC probe
C
(3)
1”
Relief Valve, pr./temp. gauge
D
(4)
1-1/2”
Return water or condensate
E
(1)
1-1/4”
Relief Valve, (alternate)
F
(1)
2-1/2”
Optional 764, 767 LWC
G
(1)
4”
Heated water or steam to application
H
(2)
1”
Optional tankless coil w/boilers, (upper rear of boiler)
* Note that the above is suggested uses of the ports. As can be seen in our photos there are
many acceptable ways to install the piping and controls. An experienced plumber and con-
trols person should be used to assure the design is functional and meets needs. One must
allow for initial cleaning and purging of oils and dirt from the water loop and then refill
and treat the water as needed to preserve boiler life. Read all the following pages carefully
and plan plumbing and control locations before starting.
Summary of Contents for L-24
Page 2: ......
Page 12: ...11 Brick Lining Location In WL 60 ...
Page 14: ...13 ...
Page 15: ...14 ...
Page 16: ...15 ...
Page 17: ...16 ...
Page 18: ...17 Notes ...
Page 19: ...18 ...
Page 20: ...19 PRESSURE GAUGE AQUASTATS LWC SENSOR ELEC BOX ...
Page 34: ...33 ...
Page 36: ...35 ...
Page 37: ...36 ...
Page 38: ...37 ...
Page 39: ...38 B10 DUAL NOZZLE BURNER INTERNAL WIRING ...
Page 40: ...39 ...
Page 46: ...45 ...
Page 48: ...47 ...
Page 49: ...48 ...
Page 53: ...52 ...
Page 58: ...57 Notes ...
Page 59: ......
Page 60: ...CC 6532 01 08 250 ...