![Coinco 9300-S Series Operation And Service Manual Download Page 8](http://html1.mh-extra.com/html/coinco/9300-s-series/9300-s-series_operation-and-service-manual_2634987008.webp)
Page 8
ACCEPTED COIN
See Figures 5 and 6
An accepted coin will be routed to either the vendor
cash box or to one of the changer coin tubes. The
(FULL) sensors in each coin tube determine which
route the coin will take. If the coin tube
corresponding to the validated coin is full (full sensor
covered by coins in change tube), the cash box gate
will open, allowing the coin to drop into the vendor
Section 3: Operation
cash box via the changer cash box chute. If the
appropriate coin tube is not full (full sensor not
covered by coins), the coin tube gate will open
directing the coin down a ramp. Along the wall of
the ramp are windows for entry into the coin tube.
As the coin reaches a window of the appropriate
size, it falls into the coin tube. All dollar coins are
always directed to the cash box via the cash box
chute.
Figure 5
Figure 6
Summary of Contents for 9300-S Series
Page 1: ...Coinco 9300 S SERIES ELECTRONIC CHANGER OperationandServiceManual...
Page 6: ...Page 6 Section 2 Installation Figure 2...
Page 18: ...Page 18 9341 S Wiring Diagram fig 14 Section 5 Troubleshooting...
Page 19: ...Page 19 Section 5 Troubleshooting 9342 S Wiring Diagram fig 15...
Page 20: ...Page 20 Section 5 Troubleshooting 9360 S Wiring Diagram fig 16...
Page 21: ...Page 21 9300 S Series Changers Section 6 Accessories...