Connect the Breakout Cable
CAUTION
:
To reduce emissions, connect the far end of the Breakout cable shield to frame ground.
Note
:
l
Perform wiring or adjustments to I/O devices when the vision system is not receiving power.
l
You can cut exposed wires short or trim wire ends. You also can tie the wires back if you use a tie made of
non-conductive material. Keep bare wires separated from the +24VDC wire.
l
When using the 15 meter Breakout cable, full 24VDC voltage must be maintained at the input leads of the
Breakout cable when the vision system is operating.
1. Verify that the 24VDC power supply is unplugged and not receiving power.
2. Optionally, connect the I/O wires to an appropriate device (for example, a PLC or a serial device). For more
information, refer to
3. Attach the Breakout cable's +24VDC (Red wire) and GND (Black wire) to the corresponding terminals on the
power supply.
CAUTION
:
Never connect voltages other than 24VDC. Always observe the polarity shown.
4. Connect the Breakout cable's M12 connector to the vision system PWR connector.
5. Restore power to the 24VDC power supply and turn it on if necessary.
49
Installation
Summary of Contents for In-Sight 7600
Page 1: ...In Sight 7000 Gen2 Series Vision System Reference Guide 2020February06 Revision 5 8 1 2...
Page 42: ...42 Installation...