5.
4. Installation
Queen Pearl with base cabinet
WATER LINE
IMPORTANT!
The machine must be disconnected from the mains
before any work is carried out.
Disconnect the power supply cable from the wall socket.
The end customer/ user is responsible for ensuring that
the water connection is compliant with the manufacturer’s
instructions.
NOTE
WORKING WITH THE CONNECTIONS
Hold the connection and press the hose as far into
the connection’s body as possible.
Disconnecting the John Guest connection
Push the grey ring out towards the connection and
pull out the hose.
If the water hoses need to be cut, make a
straight cut in order to prevent leakage.
Installation of Queen Pearl base cabinet.
1
.
Place the machine on a flat surface that is impermeable to
water.
2.
(If necessary, use a spirit level and adjust using the
machine’s adjustable feet).
3
.
Make sure air is able to circulate freely around the machine.
(Min. 10cm).
Installation must be carried out by a qualified fitter.