background image

Classification - Internal

Maintaining or Shutting Down Your 
Post Mix System

Summary of Contents for Post Mix System

Page 1: ...Classification Internal Maintaining or Shutting Down Your Post Mix System...

Page 2: ...ipment Check turn on the C02 supply Ensure syrups boxes aren t empty are connected Allow system to stabilise for 5 minutes Ensure all nozzles and diffusers are in place Once per week Pour a total of 6...

Page 3: ...uipment Clean nozzles diffusers drip trays in line with the cleaning guide Clean the valves refit nozzles diffusers Do not leave to soak in water Front End Tower or Head Turn off the water supply to t...

Page 4: ...Classification Internal Restarting your Post Mix System 3 Valve Head 10 steps to get you up and running after shut down...

Page 5: ...n the CO supply 3 Turn on the mains water supply 4 Reset the carbonator cooler 5 Cleaning Bag in Box connectors and checking best before dates 6 Replenish Carbonated water 7 Replenish in date Bag in B...

Page 6: ...rotective Equipment Items you will need to complete the restart process Check and turn on the CO supply Turn on the mains water supply Turn on the CO Check gauge goes to approx 600psi Turn on isolator...

Page 7: ...k on Clean Bag in Box Connectors Check that the Bag in Box is in date remove any that are out of date Clean connectors in clean warm water Re connect in date Bag in Boxes 6 Replenish carbonated water...

Page 8: ...ints You will need 10 ltrs of clean water in a bucket A pair of scissors An old Bag in Box Small container jug of warm water To get water into the system first cut the connector neck out of the old Ba...

Page 9: ...syrups Now connect a fresh syrup Bag in Box to the line Go to the dispense point farthest from the cooler and pour product until it flows clear Make a note of how much volume was dispensed and use th...

Page 10: ...d carbonation Wipe over the covers and display with a damp cloth making sure that power is switched off Refit the drip tray and cup rest Note Allow systems to stabilise and cool for at least 4 hours b...

Page 11: ...Classification Internal...

Page 12: ...Classification Internal Restarting your Post Mix System Hand Bar Valve 10 steps to get you up and running after shut down...

Page 13: ...n the CO supply 3 Turn on the mains water supply 4 Reset the carbonator cooler 5 Cleaning Bag in Box connectors and checking best before dates 6 Replenish Carbonated water 7 Replenish in date Bag in B...

Page 14: ...rotective Equipment Items you will need to complete the restart process Check and turn on the CO supply Turn on the mains water supply Turn on the CO Check gauge goes to approx 600psi Locate the mains...

Page 15: ...k on Clean Bag in Box Connectors Check that the Bag in Box is in date remove any that are out of date Clean connectors in clean warm water Re connect in date Bag in Boxes 6 Replenish carbonated water...

Page 16: ...ints You will need 10 ltrs of clean water in a bucket A pair of scissors An old Bag in Box Small container jug of warm water To get water into the system first cut the connector neck out of the old Ba...

Page 17: ...fresh syrup Bag in Box to the line Go to the dispense point farthest from the cooler and pour product until it flows clear Make a note of how much volume was dispensed and use this as a guide when flu...

Page 18: ...nk and discard it Pour a second drink and test for a temperature of 5 C Pour a third drink and check for taste and carbonation Wipe over the bar clamp mount the display font and the hose with the clea...

Page 19: ...Classification Internal...

Reviews: