98-150471-A02
3-1
Chapter 3
Installation
Installation
3
This chapter is organised in the following sections:
•
•
•
•
•
3.1
Unpacking
3.1.1
What’s in the box
ADU
Unpack your SAILOR 900 VSAT High Power ADU and check that the following items are
present:
• ADU with 4 lifting brackets (already mounted)
• Package with bolts, washers and cable glands (2 sizes)
ACU
Unpack your SAILOR ACU VSAT KU a and check that the following items are present:
• 1 x Ethernet cable (2 m)
• 1 x Ethernet cable (short)
• Power cable (230 VAC)
• 2 x 75 Ohm coax cables F-F (1m), for Rx and Tx
• NMEA multi-connector
• Installation manual
SAILOR900HP.book Page 1 Monday, July 18, 2016 12:44 PM