3. Quality Control
QC is run to test the accuracy of
Meter
Strips
QC Solution
Operator
Show
Running a QC
Explain
Getting rid of the first drop
Expiry dates (3 months from opening)
Content of solutions (Sugar water & dye)
What to do if the QC fails
Reference: Chapter 4 of Operator Manual
Q: When do you run a QC Test?
A: Hospital policy/pot change/
unexpected patient result/
dropped meter
Notes
6452 AccuCheck Inform II linktrainer21.2.11.indd 9
24/02/2011 10:31