CENTER RAIL
LONG CENTER RAIL SUPPORT
WITH LEVELER
CONCEAL PANEL
BED SLAT SUPPORT WITH LEVELER
2PCS
4PCS
8PCS
1PC
SHORT CENTER RAIL SUPPORT
1PC
E
F
G
H
J
ASSEMBLY TIME
20 MINUTES
1PC
1PC
A
FB
A
HEADBOARD
1PC
PART NAME
B1 (BOX 1)
FIGURE
QTY
BED RAIL
2SETS
C
D
2PCS
PART NAME
B3 (BOX 3)
FIGURE
QTY
FOOTBOARD SUPPORT LEG
WITH LEVELER
B
I
1PC
2PCS
PART NAME
B2 (BOX 2)
FIGURE
QTY
PARTS IDENTIFICATION
STORAGE FOOTBOARD
ROLL SLAT (6PCS)
PAGE 2 OF 7
ASSEMBLY TIPS:
1 . Remove hardware from box and sort by size.
1 .
Don’t
attempt
to
repair or modify parts that are broken or defective. Please contact the
store immediately.
2 . This product is for home use only and not intended for commercial establishments.
2 . Please check to see that all hardware and parts are present prior to start of assembly.
3 . Please follow attached instructions in the same sequence as numbered to assure fast & easy assembly.
!
Warning!
ASSEMBLY INSTRUCTIONS
(B1
-
B3)
(B1)
* FROM BOX 1 HEADBOARD
(B2)
* FROM BOX 2 FOOTBOARD COMPLETE