background image

CENTER RAIL

LONG CENTER RAIL SUPPORT 
WITH LEVELER

CONCEAL PANEL

BED SLAT SUPPORT WITH LEVELER

 2PCS

 4PCS

 8PCS

 1PC

SHORT CENTER RAIL SUPPORT
 

 1PC

E

F

G

H

J

 ASSEMBLY TIME

20 MINUTES

 1PC

 1PC

A

FB

A

HEADBOARD

 1PC

PART NAME 

B1 (BOX 1)  

FIGURE 

QTY 

BED RAIL

2SETS

C

D

 2PCS

PART NAME 

B3 (BOX 3)  

FIGURE 

QTY 

FOOTBOARD SUPPORT LEG
WITH LEVELER

B

I

 1PC

 2PCS

PART NAME 

B2 (BOX 2)  

FIGURE 

QTY 

PARTS IDENTIFICATION  

STORAGE FOOTBOARD

ROLL SLAT (6PCS)

PAGE 2 OF 7  

 

 ASSEMBLY TIPS:

1 . Remove hardware from box and sort by size.

1 .

 

Don’t

 

attempt

 

to

 

repair or modify parts that are broken or defective.  Please contact the

    

 store immediately.

2 . This product is for home use only and not intended for commercial establishments.  

2 . Please check to see that all hardware and parts are present prior to start of assembly.

3 . Please follow attached instructions in the same sequence as numbered to assure fast & easy assembly.

!    

 

Warning!

 

 ASSEMBLY INSTRUCTIONS

  (B1 

-

 B3)  

(B1)
* FROM BOX 1 HEADBOARD 

 (B2)
* FROM BOX 2 FOOTBOARD COMPLETE 

Reviews: