![Coast-Air CEG081C Operating Instructions Manual Download Page 10](http://html.mh-extra.com/html/coast-air/ceg081c/ceg081c_operating-instructions-manual_2628548010.webp)
8,000
Operating Instructins
www.coastair-ac.com
8
Accordion Panel and cabinet Assembly
1.Hold the Accordion Panel in one hand and gently
pull the center to free the open end.
2.Slide the free end of the panel into the cabinet as
shown. Be sure to leave enough space to slip the
top and bottom of the frame into the rails on the
cabinet.
3.Once the panel has been installed on the side of
the cabinet, make sure it sits securely inside the
frame channel by making slight adjustments. Slide
the top and bottom ends of the frame into the top
and bottom rails of the cabinet. Slide the panel all
the way for both sides.
OFFSET
STOOL
SILL
INTERIOR
WALL
EXTERIOR
WALL
Air conditioner
Bottom channel
4.Use two or more people, place the air conditioner
into the window opening so the bottom of the air
conditioner frame is against the window sill.
Tilt the back of the unit slightly download to allow
accumulated rain water to drain out.
5.Fasten cabinet bottom to window sill using two
1/2” screws. Pre-drill holes if needed.
8
Summary of Contents for CEG081C
Page 1: ...CEG081C CEG123C ...
Page 3: ...8 000 Operating Instructins www coastair ac com 1 1 ...
Page 18: ...8 000 Operating Instructins www coastair ac com 16 16 FIG 15 15 ...
Page 19: ...8 000 Operating Instructins www coastair ac com 17 17 ...
Page 20: ...8 000 Operating Instructins www coastair ac com 18 18 ...
Page 22: ...8 000 Operating Instructins www coastair ac com 20 PAGE INTENTIONALLY LEFT BLANK ...
Page 23: ...8 000 Operating Instructins www coastair ac com 21 PAGE INTENTIONALLY LEFT BLANK ...
Page 24: ...8 000 Operating Instructins www coastair ac com 22 11 2021 ...