1
2
2
3
4
4
U
S
M5
T
M5
T
X1
X1
S
1
2
3
4
1
2
2
3
4
4
U
S
M5
T
M5
T
X1
X1
S
1
2
3
4
N1
N2
N3
N4
STEP 13: Install the Roof Plates on the Long Sides of the Gazebo. Work your way
from left to right. Start by sliding Roof Plate 1 (Part N1) into position. Then overlap
Roof Plate 2 (Part N2) as shown in the diagram and Slide Roof Plate 2 (Part N2) into
Position.
Affix Roof Plate 1 (Part N1) and Roof Plate 2 (Part N2) into place by using the bolts
and Plastic
gap fillers
(Part M5) at the Positions 2 and 4 on the diagram.
Slide Roof Plate 3 (Part N3) into position. Roof Plate 2 (Part N2) should Overlap
Roof Plate 3 (Part N3) as shown in the diagram.
Affix Roof Plate 3 (Part N3) and Roof Plate 2 (Part N2) into place by using the bolts
at the Positions 1 and 3 on the diagram.
Slide Roof Plate 4 (Part N4) into position. Roof Plate 3 (Part N3) should Overlap
Roof Plate 4 (Part N4) as shown in the diagram.
Affix Roof Plate 4 (Part N4) into place by using the bolts and Plastic
gap fillers
(Part
M5) at the Positions 2 and 4 on the diagram.
2
2
2
2