12
Test Procedures
TROUBLESHOOTING AND ELECTRICAL
SYSTEM: DIESEL VEHICLES
V
E
S
A
B
D
WF
E
M
A
RF
V
E
S
A
B
D
WF
E
M
A
RF
2102
Figure 12-40
Bed Lift Motor Voltage Reading with Switch
in UP position
2103
Figure 12-41
Bed Lift Motor Voltage Reading with Switch
in DOWN position
TEST PROCEDURE 37 – Bed Lift Switch
1.
Remove the bed lift switch.
See Bed Lift Switch Removal on page 14-9.
2.
Check continuity between the terminals
of the switch and compare the readings with
the Bed Lift Switch Continuity Table. If continuity readings do not match the table, replace the switch.
Lift Switch Installation on page 14-9.
1
2
4
5
6
8
A
B
A. Up Position B. Down Position
Terminal:
1. #14 Black w2 2. #14 Red w3 4. #14 Red w7 5. #14
Red w7 6. #14 Yellow w5 8. #14 Black w2
2104
Figure 12-42
Bed Lift Switch Terminals (Rear View)
Page 12-42
2013 Carryall 295/XRT 1550 Maintenance and Service Manual
Summary of Contents for Carryall XRT 1550
Page 2: ......
Page 28: ......
Page 40: ......
Page 62: ......
Page 106: ......
Page 120: ......
Page 180: ......
Page 224: ......
Page 272: ......
Page 310: ......
Page 344: ......
Page 362: ......
Page 370: ......
Page 418: ...NOTES...
Page 428: ...NOTES...
Page 430: ...NOTES...
Page 431: ......
Page 432: ......