24
Onboard Computer (OBC)
ELECTRICAL COMPONENTS: ELEC-
TRIC VEHICLES
2
1
Figure 24-7
Solenoid
SOLENOID INSTALLATION
1.
Mount solenoid (2) onto component mounting plate with screws (1)
2.
Tighten screws (1) to 60 in-lb (6.8 N·m).
3.
Using the wiring diagram, install the wires, washers, and nuts onto the large mounting posts. Tighten nuts to 77
in-lb (8.7 N·m).
See Wiring Diagrams, Section 22, Page 22-2.
4.
Install the blue/white and light blue wires onto the small terminals of the solenoid
.
5.
Install speed controller cover.
See See Installing the Speed Controller Cover on page 24-8.
6.
Connect the batteries.
See Connecting the Batteries – Electric Vehicles, Section 1, Page 1-4.
ONBOARD COMPUTER (OBC)
See General Warning on page 1-1.
TESTING THE ONBOARD COMPUTER
See Test Procedure 2 – Onboard Computer Solenoid Lockout Circuit on page 22-11, Test Procedure 21 –
Onboard Computer Silicon-Controlled Rectifier (SCR) Circuit on page 22-29 and Test Procedure 22 – Onboard
Computer Gray Wire and Fuse on page 22-29.
ONBOARD COMPUTER REMOVAL
1.
Disconnect the batteries and discharge the controller.
See Disconnecting the Batteries – Electric Vehicles,
2.
Remove speed controller cover.
See Removing the Speed Controller Cover on page 24-8.
3.
Unplug the six-pin connector (1) at the OBC
Page 24-10
2007-2009 Turf 252, Carryall 252 and XRT 900 Maintenance and Service Manual