Cloudwise COOLCart32 Manual Download Page 14

13

1-8

9-16

17-24
25-32

Power Switch

1-8

9-16

25-32

17-24

Fig. N

2. Charging Order-Inside the rear lockable back door.(Fig.O )

3. Power Modes-

Inside the rear lockable back door.

(Fig.O )

Fig. O

Reset

Auxiliary Outlets

Zone 1 LED Light
Zone 2 LED Light
Zone 3 LED Light
Zone 4 LED Light

4. Cycle Timer-Inside the rear lockable back door.(Fig.O )

1. Charging Zone(Fig.N )

CHARGING SETTINGS

PREPARATION

(1)  

(3)

Zone 1  1-8

Zone 3  17-24

Zone 2  9-16

Zone 4  25-32

(2) 

(4)

(1)  

1-2 -> 3-4: Charge Zone 1 and Zone 2 at the same �me, 

and when they are done, then move to charge zone 3 

and Zone 4 simultaneously.

1 -> 2 -> 3 -> 4: Charging cycle (Zone1, Zone 2, Zone 3 and 

Zone 4) is sequen�ally executed.

(1)  

(2)

Automa�c power off a�er 8 hours

Con�nuous charging(∞)

None: No Cycle status

Please note that when any modes or se�ngs are selected, it needs to re-start the cart by 

pressing  power switch to operate them accordingly .

If any row of LED indicators glows solid Green 

light, it means the charging is in 

progress.

(2)

If 1-2 -> 3-4 charging order is selected, it charges only 

Zone 1 and Zone 2 at once.

If 1 -> 2 -> 3 -> 4 charging order is selected, it charges 

only Zone 1.

b.

a.

(1)

(2)

30,45,60…135 to 150 (min): Available cycle �mes for selec�on

b.

a.

Under the 1-2 -> 3-4 charging order, when choose 30 (min), a�er charging Zone 1 and Zone 2 

30 minutes, it moves to charge the next Zone (Zone 3 and Zone 4) 30 minutes. So on and so 

forth.

In the charging order 1 -> 2 -> 3 -> 4, when select 60 (min), it sequen�ally charges each zone 

60 minutes one by one. So on and so forth.

Cycle Timer 

(m)

None

150

30

45

60

75

90

105

120

135

Power Modes

Charging Order

8H / 

1-2    3-4 / 1   2   3   4 

5. Reset

-Inside the rear lockable back door.(Fig.O )

The  cart provides  the overloading  protec�on  mechanism  that requires pressing  the “  Reset” 

bu�on to get released to resume to “Power ON” status.   

Summary of Contents for COOLCart32

Page 1: ......

Page 2: ...ON INSTRUCTION IMPORTANT SAFETY INSTRUCTIONS SAFETY FIRST 2 INTRODUCTION 4 SPECIFICATIONS 8 SIDE HANDLE MOUNTING 9 COMBINATION LOCK 10 SLOT INSTALLATION DISASSEMBLY 12 USE OF ADAPTER HOLDER 13 CHARGIN...

Page 3: ...DO NOT block the ven la on holes used for air circula on DO NOT overload objects on the cart shelves work pla orm maximum loading 25kg 55 1lbs each non extendable shelf maximum loading 48kg 105 8lbs D...

Page 4: ...ning shall be included in the instruc ons for use Warning This is a class A product In a domes c environment this product may cause radio interference in which case the user may be required to take ad...

Page 5: ...ncl Weight 596mm 916mm 58kg Slot size Width Depth Height 25mm 310mm 260mm Storage charging capacity LED status indicators Lockable doors Storage shelves Cable management Wall mount hook Swivel casters...

Page 6: ...5 Cool Cart32 Side Handle Power Cord Wrench M6 Screw x2 User Manual PACKAGE CONTENTS INTRODUCTION Front Door Key 208 Rear Door Key 001...

Page 7: ...6 5 Casters Work Pla orm Side Handle Combina on Lock Front Inside Slots OPERATION INSTRUCTION Front PREPARATION...

Page 8: ...7 Back Inside Adapter Holder Intelligent Control Panel Power Strip Back Ven la on Holes Door Lock...

Page 9: ...24 25 32 Cable Rack Auxiliary Outlets Lock Bracket Use to Secure Cart Power Switch LED Indicator PREPARATION SIDE HANDLE MOUNTING Install the side handle on the right side of the box with two M6 scre...

Page 10: ...lock Fig F Fig G Fig E 4 Return the Reset Lever back to A posi on Fig D Your lock is now ready to open at its new combina on 2 Counterclockwise turn the Knob 90 degree to the open posi on Fig B 3 Pus...

Page 11: ...Fig H Fig I Insert the bo om tabs of each divider into the bo om hole of xed drawer and then press the longer tab towards your body un l hear click sound to complete the assembly Fig J Fig K When dis...

Page 12: ...11 As shown Fig K the do ed line represents wire slot Route the adaptor DC end cable along with the wire slot Fig L Slide the locking piece to ghten the wire Fig M 4 Wire Fig L Fig M 5...

Page 13: ...E CART PREPARATION a Connect power cord to cart and wall outlet b Turn on the power switch to begin charging NOTE Turn o the power switch before plugging the cart to wall outlet Auxiliary outlet and p...

Page 14: ...ed it needs to re start the cart by pressing power switch to operate them accordingly If any row of LED indicators glows solid Green light it means the charging is in progress 2 If 1 2 3 4 charging or...

Page 15: ...nty for electrical components All of our products come with a quality and safety assurance 1 2 Make sure power cords are undamaged Make sure power cords have rmly inserted into the available socket wi...

Reviews: