background image

3

1

Tower in center with hang rods on the left and right

A)

Assemble and build your towers first. 

Place your towers in the closet.

B)

Choose which side you want the long hang 

and the double hang to be, as you may want 

a wider width of double hang.

C)

Measure the length that the rods will need 

to be for each side. Make sure that the span 

between units or unit and wall is not greater 

than 48 in.

D)

Install the closet rods and top shelves 

(if purchased for your design)

E)

The top shelves and closet rods fit a maximum span of 48 in. The expandable closet rods are 

30 in. to 48 in. long. If the length is shorter than 30 in. the rod will need to be cut.

© 2018 ClosetMaid LLC.  All Right

s

 Reserved. | Ocala, FL 34471 | 1-800-874-0008 | www.closetmaid.com

Assemble and install any doors and drawers into the tower unit.

F)

Summary of Contents for Laminate

Page 1: ...2018 ClosetMaid LLC All Rights Reserved Ocala FL 34471 1 800 874 0008 www closetmaid com Laminate Installation Tips 5 18 Tools you will need for assembly 50 in 25 in...

Page 2: ...ation is important when designing your closet In most circumstances you will want to place your tower in front of the closet door for ease of access The height of most towers is 82 in to 83 in You wil...

Page 3: ...r each side Make sure that the span between units or unit and wall is not greater than 48 in D Install the closet rods and top shelves if purchased for your design E The top shelves and closet rods fi...

Page 4: ...the right hand side Measure the length that the rods will need to be Make sure that the span between units or unit and wall is not greater than 48 in D Install the closet rods and top shelves E The to...

Page 5: ...tyle towers are up to 20 in deep C Attach the corner unit and Tower to the wall Choose whether you want the long hang or the double hang for the middle section Measure the length that the rods will ne...

Page 6: ...embling and placing the corner units B Next assemble and place the closet towers into position C Install closet rods and top shelves Top shelves may need to be cut to size D Assemble and install any d...

Page 7: ...A Assemble and place tower units in position first Remembering to span 48 in or less between units and side walls B Next install closet rods and top shelves between the units and side walls using the...

Reviews: