8
(20)
BP
51480
Hanging
Cabinet
5
CAUTION:
Do not move or stand
the unit upright until the back
panel(s)
(B)
is nailed in place.
PRECAUCIÓN:
No mueva ni
coloque la unidad de pie hasta
que el panel trasero
(B)
esté
clavado en su lugar.
MISE EN GARDE :
Ne pas
déplacer ni redresser le meu-
ble avant que les panneaux
arrières
(B)
soient cloués en
place.
INSTALLATION OF HANG TRACK & STANDARDS
The Hang Track and Standards must be attached with screws to wall studs.
When using the Maximum Load Hang Track for installation,
the following weight load specifications apply:
• 100 lbs. per laminate shelf
• 50 lbs. per drawer
• Total weight per 40” Hang Track not to exceed 900 lbs. (Including the weight of each cabinet.)
• Total weight per 80” Hang Track not to exceed 1,900 lbs. (Including the weight of each cabinet.)
• Each standard should be secured with screws in all mounting holes.
Hang Track, Standards & Hardware sold separately. Use #12 x 2” pan head screw.
STUDS: Screw directly into studs.
CONCRETE: Drill 1/4” holes. Insert #12 wall anchors. Screw into place.
1
2
3
4
1. Locate the wall studs. Use a
level, then install the Hang Track to
the studs with screws.
2. Hang the first Standard as
shown, use a level, then attach the
standard to the wall stud with
screws.
3. Use the spacer board and hang
the second Standard from the
Hang Track.
4. Hang the completed cabinet on
the Standards. Make sure the
hangers are "locked" into the slots
on the Standards. Then attach the
second Standard to the wall stud
with screws as shown in Step 2.
Spacer Board
SHELFTRACK
Option
6