![Cloos NexT 452 AC Operating Instructions Manual Download Page 49](http://html1.mh-extra.com/html/cloos/next-452-ac/next-452-ac_operating-instructions-manual_2625802049.webp)
49
By tipping the arrow button on the right, you can enter the "Pause time". If
you enter a "Pause time", the interval function is started.
"Spot welding time" and "Pause time" are added and result in the "Interval
time".
6.4 MAIN - Programming - Setting ranges
Setting ranges can be defined for starting power, main power and end
crater power.
Prerequisite for configuring the setting ranges is the "Access management" or
the optional "User management", see section "9.4 Access rights" on page 70.
6.4.1 Input of setting ranges
In order to be able to input the setting ranges you have to log on as "Con-
figurator" ("MAIN (2)" - "Log on"). The setting ranges are input on the page
"MAIN" using the "Progr" function.
Use the arrow buttons to select the start, main or end crater power. The
"Setting range" function appears, see Figure 16.
Figure 14.
Interval time
Programmieren
Impuls-
sync.
Stell-
bereich
Tandem
Schweiß-
kreis
Expert-
Mode
Aktiver
QWD
V
0
A
0.0
P R O G R A M M I E R E N
Startleistung
Dyn.
6.0 m/min
- 0 -
6
2
Puls 4 -Takt
1.2 mm Fe
82% Argon 18% Co
2
Figure 15.
"Programming" menu
Summary of Contents for NexT 452 AC
Page 4: ......
Page 11: ...11 Block 1 Operational Safety...
Page 27: ...27 Block 2 Basic information Qineo NexT...
Page 110: ...110 Job mode...
Page 148: ...148...
Page 149: ...149 Block 4 Additional information...
Page 164: ...164 SD module...
Page 191: ...191 Block 6a Error messages...
Page 207: ...207 Block 6b General maintenance instructions...
Page 212: ...212...
Page 213: ...213 Block 7 Automation...
Page 232: ...232...
Page 233: ...233...
Page 234: ...www qineo de...