TECHNICAL PASSPORT
Passport is designed in accordance with the requirements of GOST 2.601
Instructions for the installation and connection of the air
handling unit.
1. Axis line of the fans of the system should not to be directed to
permanent places of sleep and rest.
2. Recommended location of the heat exchanger is 30 cm from the ceiling
and from the nearest wall.
3. Heat exchanger installation diagrams:
View of the
installed recuperator from
outside
View of the installed
recuperator
from inside
4. Measure the wall thickness. Drill a hole
with a slight slope of 2-5º in the
direction of the street in the outer wall
with diamond drill. Diameter of
mounting holes - see table 2.
5. Conduct a visual inspection of the integrity of the recuperator.
Connect the power cord to the network source.
Perform a visual check on the performance of the operation
modes of the heat exchanger fans.
Disconnect the power cord from the network source.
6. Insert heat exchanger in the hole.
7. Install the outside of the duct with the weatherproof grille out into the
hole in the wall. The weatherproof grill should be at least 2 cm from the
outer surface of the wall. External part of the recuperator is covered with
thermal insulation so that the duct fits tightly into the hole in the wall. In
the case of tight fit to the walls of the mounting hole, it is recommended
to use a sealant
8. A decorative metal ring is provided on the inside of the heat exchanger
to block the mounting hole in the wall.
9. Connect the power cord to the network source. Turn on heat exchanger.
Supply and exhaust ventilation system is ready for operation.
not less than 30 cm
not less than 30 cm
Installation sheme
34