Page 40
FF6300 Operating Manual
NOTICE
Referring to Figure 3-21:
measure to the top point for the
dimension to the center of the
16-mm rod.
Swing the tape measure to the
appropriate bottom point to
align with the actual OD for the
chain clamp.
Example for arrangement B: In order
to chain clamp to a flange that is 55"
(1,397 mm), calculate the following:
1. 55" – 9" = 46"
2. 46" / 2 = 23"
3. Adjust two of the legs to 23".
4. Adjust the third leg to 23.25".
3.7.4
Attaching the OD mount assembly to the workpiece
The OD mount vertical legs attach to the workpiece with a single M16 x 2.0 all-thread
rod at each leg. There are numerous ways to mount the machine to the workpiece.
Three possible ways to attach the OD mount assembly to the workpiece are:
•
Attach the vertical legs by
tack-welding an M16 nut to
the workpiece. Use a mini-
mum of a 3/16" (4.76 mm)
weld x 1" (25 mm) long
(Figure 3-22).
•
Attach the vertical legs by
clamping a plate with an
M16 threaded hole to the
workpiece at each mount-
ing point.
POINT FOR
ARRANGEMENT A
POINTS FOR
ARRANGEMENT B
F
IGURE
3-21. M
EASUREMENT
POINTS
FOR
EACH
ARRANGE
-
MENT
F
IGURE
3-22. A
TTACHING
THE
OD
MOUNT
WITH
A
TACK
-
WELD
NUT
Summary of Contents for FF6300
Page 2: ......
Page 4: ...Page B FF6300 Operating Manual CLIMAX GLOBAL LOCATIONS...
Page 5: ...P N 80679 Rev 10 Page C CE DOCUMENTATION...
Page 10: ...Page iv FF6300 Operating Manual This page intentionally left blank...
Page 14: ...Page viii FF6300 Operating Manual This page intentionally left blank...
Page 16: ...Page x FF6300 Operating Manual This page intentionally left blank...
Page 21: ...P N 80679 Rev 10 Page 5 This page intentionally left blank...
Page 28: ...Page 12 FF6300 Operating Manual This page intentionally left blank...
Page 31: ...P N 80679 Rev 10 Page 15 2 1 1 ID chuck assembly FIGURE 2 1 ID CHUCK ASSEMBLY...
Page 33: ...P N 80679 Rev 10 Page 17 2 1 3 OD mount assembly FIGURE 2 3 OD MOUNT ASSEMBLY...
Page 40: ...Page 24 FF6300 Operating Manual This page intentionally left blank...
Page 71: ...P N 80679 Rev 10 Page 55 FIGURE 3 44 BACKFACING ATTACHMENT DIMENSIONS...
Page 72: ...Page 56 FF6300 Operating Manual This page intentionally left blank...
Page 88: ...Page 72 FF6300 Operating Manual This page intentionally left blank...
Page 90: ...Page 74 FF6300 Operating Manual FIGURE 6 1 FF6300 IN CONTAINERS STEEL CONTAINER WOODEN CRATE...
Page 92: ...Page 76 FF6300 Operating Manual FIGURE 6 3 PACKING THE FF6300 WITH OD MOUNT...
Page 94: ...Page 78 FF6300 Operating Manual This page intentionally left blank...
Page 99: ...P N 80679 Rev 10 Page 83 This page intentionally left blank...
Page 126: ...Page 110 FF6300 Operating Manual This page intentionally left blank...
Page 129: ...P N 80679 Rev 10 Page 113 APPENDIX C SDS Contact CLIMAX for the current Safety Data Sheets...
Page 130: ...Page 114 FF6300 Operating Manual This page intentionally left blank...
Page 131: ......
Page 132: ......