background image

6.

 

With no obstructions behind the marked locations, drill out the holes with the 3-1/2” hole 
saw. 

7.

 

Once the holes have been drilled, insert a ClimateRight Building Flange (D). 

Note: Check the length of the flange, if the Building Flange is too long, it can be cut to 
length with a hacksaw.  The grooves on the flange are spaced at 1” intervals. 

8.

 

If necessary, mark the screw hole locations with a pencil and drill pilot holes for the screws.  
(For #6 wood screws use a 1/16” drill bit.) 

9.

 

Optional: Lay down a bead of caulk on the side of the Building Flange that will face the 
building. (See Figure 3) 

10.

 

Take 3 screws and secure the Building Flange into the structure.  Repeat steps 6-9 for the 
second Building Flange (D). 

11.

 

The Air Hoses (C) and Hose Flanges (B) are pre-assembled at the factory.  Take one of these 
assemblies and extend the accordion style hose so it is long enough to reach the unit and 
the structure. 

12.

 

Mate the Hose Flange (B) to the ‘Air Outlet’ Unit Connector Flange (A) (See Figure 4) that is 
pre-installed on the unit.  Turn the Hose Flange clockwise until they “click” together.  

13.

 

Take the other side of the Air Hose and Hose Flange and install it onto the upper Building 
Flange (D). 

14.

 

Install the second Air Hose onto the ‘Air Inlet’ by repeating steps 11 and 12, except install 
onto the lower Building Flange. 

15.

 

Take the power cord and plug the unit into a GFCI protected receptacle or a receptacle with 
weatherproof (while-in-use) cover

16.

 

The ClimateRight unit is now ready for use.  Refer to the Owner’s Manual for instructions on 
how to operate the unit. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3 

Figure 4 

Reviews: