27
Part
No
.
A042
A044
A045
A946
047
048
m3
a1
a2
a4
a5
p3
Size
683
2’2
7
/
8
”
698
2’3
1
/
2
”
698
2’3
1
/
2
”
750
2’5
1
/
2
”
300
11
13
/
16
”
200
7
7
/
8
”
-
M6x10
M6
Φ4.2x9.5
Φ3.5x19
-
Qty
1
1
1
2
1
1
2
6
6
4
4
2
Passion A907
Vent No.
2
H1
1
2
3
1
2
3
8
4
5
6
7
Vent
Package No.4
Square No.1 & No.2
When assembling the vent
using screw #a5, it is essential to use a lubricant
on the screws. A power screwdriver here is almost
too much force, as it is easy to strip the heads. If
possible turn the screws in by hand.
Square No.3
The push rod
should be
mounted so the
handle extends
up.
Square No.4
When
mounting
part #048 onto part #A042, the
left post should be directly in line
with the center of the vent.
Square No.6
The com-
pleted vent slide into the
ridgepole which act as a
self-hinge.
Square No.7
Part #p3 is plastic
barrel shaped
piece that is used
on either side of
the vent to keep it
from moving side
to side. The screw
#a4 will expand the
plastic and hold it
firm.
A044
a5
A946
A946
a5
A045
A044
A946
A946
A045
p1
A045
047
a4
A042
048
a1/a2
A943
A042
m3
a1/a2
By the time you are finished with glazing bars
and PC panels assembly. You should already
have windows assembled.
Step 8