background image

1949310 

V1.1 

21 March 2019 

 

Zoneworks and DATA Monitored Options

 

 

Supalites  with part numbers –ZW

  and  -DATA 

are fitted with Zoneworks communications modules 

(nodes).These fittings are monitored using either Powerline Carrier Technology that utilising the power 

cable to provide data communication or a dedicated data cable to/from data routers installed on a 

dedicated data trunk connected to a central Server (can also be connected via Ethernet/Internet/Fibre). 

Zoneworks software on the server is used to monitor, coordinate testing and collate test data from each 

fitting. Zoneworks Supalites can be commissioned by a single push of the test switch or scanning of the 

supplied barcode. The LED Test Switch indicator provides a multifunction indication of the status of the 

‘Supalite during testing and normal operation: 

State

 

LED Operation

 

Commissioned 

LED on Solid (GREEN) 

Un-commissioned 

LED flashes at 0.5Hz (0.5s GREEN, 0.5s Yellow) 

Emergency Light Test In Progress  LED flashes at 3s On (Yellow) & 0.5s Off 

 

In the case of the DATA version a 2-way “figure 8” cable and terminal block facilitates the connection to 

the DATA network via a multi-drop bus (daisy chain connection).  For further information of installation of 

a Zoneworks system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl. DATA 

version)  

 

DALI EM Option

 

 

Supalites with part numbers 

-DALI 

are fitted with DALI modules (nodes) that facilitate connection and 

integration to 3

rd

 Party Lighting Control Systems.  Before installing the -DALI Supalite, please confirm that 

the Lighting Control System has the capability to monitor DALI Emergency Luminaires.  The Supalite will 

be addressed and configured into the control system by the Lighting Control System Commissioning 

Technicians and not Clevertronics.   

State

 

LED Operation

 

Commissioned/ Un-commissioned  LED on Solid (GREEN) 
Emergency Light Test in progress  LED flashes at 1s On (Yellow) & 1s Off 
“IDENTIFY COMMAND” 

Fitting goes into emergency mode for 10 seconds 

 

A 2-way “figure 8” cable and terminal block facilitates the connection to the DALI network OR a 5/6way 

“structured wiring system” lead and plug facilitating the power and DALI connection.  DALI connections 

are marked as Da Da.  

 

 

Clevertest and Clevertest Plus 

Refer to the supplementary operation guide supplied with the Product. 

 

After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red 

flashing for a period up to 2 minutes.

 

 

 

 

 

 

 

L10™ Supalite LED Emergency Luminaire

 

Installation & Maintenance Instruction Leaflet

 

 

NOTE: Standard product codes with this symbol 

are enabled with Clevertest Plus capability.  Please refer to the 

operation guide supplied with the product for details.

 

 

Australia (Head Office) 

195 Chesterville Rd 

Moorabbin VIC 3189  

Phone: +61 3 9559 2700  

E-Mail: [email protected]

 

 

 

IP20

 

 

 

 

UK OFFICE 

362 Stockley cl 

West Drayton UB7 9BL 

 

Models:  

 

 

LFLLED

-xx-yy

 

Testing:

 

 

Testing:

 

 

 

Manual Test 

 

xx = Blank 

 

Black 

yy = BLK 

 

Zoneworks

 

xx = ZW 

 

 

 

 

Z/W DATA  

 

xx = DATA 

 

 

 

DALI Comp.     

 

xx = DALI 

 

 

 

 

Clevertest 

xx = CT 

 

 

 

 

(NOTE: -CT Products supplied with the Clevertest Plus Symbol       are activated with Clevertest PLUS 

capability. Please refer to the operation guide supplied with the product for details).

 

 

 

Spare Parts:

 

1530230

 

BATT: L10 3.3V 5000mAh.200mm lead.Brkt. 

1100955

 

LED Flood LampHeadAss,Cable&Cnnctr,Right

 

1100954 

LED Flood Lamp HeadAss,Cable&Cnnctr,Left 

8002922 

PCA:CFLLED UK CT10142-L8 2C250/450 CTP 

1100956    

Black Left LED Lamp Head Ass, Cable & Connector 

1100957 

Black Right LED Lamp Head Ass, Cable & Connector   

 

Important:

 

It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before installation, 

ensure that the electricity supply has been switched off and isolated. Installation must be carried out in 

accordance with the relevant British Standards.

 

 

 

 

 

 

 

 