1942264
V1.0
29 March 2022
Instruction Sheet Template - V1.3
–
Updated 20/01/2022
Clevertest Plus
Refer to the supplementary operation guide supplied with the Product.
After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red
flashing for a period up to 2 minutes.
For products with a Dome (-D), the Dome may require removal to successfully scan the fitting with a
camera using the CleverSparky App.
Maintained fittings (LLIFE
M
-PRO-SM-vv-xx-yy-zz-ww) cannot be scanned with a camera using the
CleverSparky App as the maintained light source interferes with the camera scanning function. To
register the fitting manually enter the serial number from the QR code and visually read the test result
and enter manually into CleverSparky.
Zoneworks HIVE Monitored Options
Fittings with part numbers
-HV/-HVG
are fitted with Zoneworks communications modules (nodes). These
fittings are monitored using RF transceiver modules operating in the ISM band connected to a central
Server (can also be connected via Ethernet/Internet/Fibre). Zoneworks software on the server is used to
monitor, coordinate testing and collate test data from each fitting. Zoneworks Fittings can be
commissioned by scanning the supplied barcode. The LED Test Switch indicator provides a multifunction
indication of the status of the fitting during testing and normal operation:
Option
State
LED Operation
HV, HVG,
Commissioned
LED on Solid (Green)
HV, HVG
Un-commissioned
With network connectivity
Batt plugged-in:
yellow 1s, green 1s
Batt unplugged:
red 1s, off 1s
HV, HVG
Un-commissioned
Without network connectivity
Batt plugged-in:
yellow 250mS,
green 250mS, yellow 250mS, green
250mS, green 1s
Batt unplugged:
red 250mS, off
250mS, red 250mS,off 250mS, off 1s
HV, HVG
Emergency Light Test In Progress
LED flashes at yellow 1s , 0ff 1s
For further information of installation of a Zoneworks system, please refer to the Zoneworks Users Guide
and Commissioning Guide
DALI EM Option
Luminaires with part numbers having
-DALI
are fitted with DALI modules (nodes) that facilitate connection
and integration to 3
rd
Party Lighting Control Systems. Before installing the -DALI luminaire, please confirm
that the Lighting Control System has the capability to monitor DALI Emergency Luminaires. The -DALI
fitting will be addressed and configured into the control system by the Lighting Control System
Commissioning Technicians and not Clevertronics.
State
LED Operation
Commissioned/ Un-commissioned
LED on Solid (Green)
Emergency Light Test in progress
LED flashes at 1s On (Yellow) & 1s Off
“IDENTIFY COMMAND”
Lamp and Status LED Flash for 30 seconds
A 2-
way “figure 8” cable and terminal block facilitates the connection to the DALI network. DALI
connections are marked as Da Da.
L10
TM
LIFELIGHT PRO Surface Mount Emergency
Luminaire
Installation & Maintenance Instruction Leaflet
Victoria (Head Office & Manufacturing)
Website:
Email:
Phone:
+61 3 9559 2700
Fax:
+61 3 9559 2799
New South Wales
Phone:
+61 2 8805 6400
Fax:
+61 2 8805 6444
Queensland
Phone:
+61 7 3442 9700
Fax:
+61 7 3442 9777
South Australia/Northern Territory
Phone:
+61 8 8301 8800
Fax:
+61 8 8351 8286
Western Australia
Phone:
+61 8 9207 0000
Fax:
+61 8 9207 0088
New Zealand
Phone:
+64 800 548 448
Designed in Australia to comply with the requirements
of AS2293.3: 2019 and AS/NZS CISPR15: 2017
NOTE: Standard product codes with this symbol are
enabled with Clevertest Plus capability. Please refer to the
operation guide supplied with the product for details.
Models:
LLIFEx-PRO-SM-vv-xx-yy-zz-ww
Testing:
Options:
Manual Test
xx = Blank
Dome
z=D
Zoneworks HIVE
xx = HV/HVG
Tamperproof
yy=TP
DALI Registered.
xx = DALI
Colour, Black
ww=BLK
Non-Maintained
x=Blank
Maintained
x=M
Switched Active
vv=SA
Spare Parts:
1530231
Replacement Battery
8003081
Replacement Emergency LED Board
8003501
Replacement Emergency Driver
Important:
It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before installation,
ensure that the electricity supply has been switched off and isolated. Installation must be carried out in
accordance with the relevant Australian and International Standards.