background image

1942384 

V1.0 

25 June 2020 

 

Clevertest and Clevertest Plus 

 

Refer to the supplementary operation guide supplied with the Product.

 

 

After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red 

flashing for a period up to 2 minutes. 

Note: To scan Status LED on the fitting, ring and lid at the front of Bunkalite needs to be removed. 

 

Status LED Note: 

Status LED is High Brightness and may appear as two separate spots as 

illustrated. If Red and Green are seen at the same time, this needs to be taken 

as Yellow in this Clevertest Plus operation guide.

 

 

 

Zoneworks, HIVE and DATA Monitored Options

 

Fittings with part numbers -ZW,  -HVG,  -DATA are fitted with Zoneworks communications modules 

(nodes). These fittings are monitored using either Powerline Carrier Technology that utilize the power 

cable to provide data communication, RF transceiver modules operating in the ISM band or a dedicated 

data cable to/from data routers installed on a dedicated data trunk connected to a central Server (can also 

be connected via Ethernet/Internet/Fibre). Zoneworks software on the server is used to monitor, 

coordinate testing and collate test data from each fitting. Zoneworks Fittings can be commissioned by a 

single push of the test switch or by scanning the supplied barcode. The LED Test Switch indicator provides 

a multifunction indication of the status of the fitting during testing and normal operation: 

Option 

State 

LED Operation 

ZW, HVG, DATA 

Commissioned 

LED on Solid (Green) 

ZW, DATA 

Un-commissioned 

Batt plugged-in: 

red & green 1s, green 1s 

Batt unplugged: 

red 1s, off 1s 

HVG 

Un-commissioned 

With network connectivity 

Batt plugged-in: 

red & green 1s, green 1s 

Batt unplugged: 

red 1s, off 1s 

HVG 

Un-commissioned 

Without network connectivity 

Batt plugged-in: 

red & green 1s 250mS, green 

250mS, red & green 1s 250mS, green 250mS, 

green 1s 

Batt unplugged:

 red 250mS, off 250mS, red 

250mS,off 250mS, off 1s 

ZW, DATA 

Emergency Light Test In Progress 

LED flashes at red & green 1s 5s , 0ff 1s 

HVG 

Emergency Light Test In Progress 

LED flashes at red & green 1s 1s , 0ff 1s 

In the case of the DATA version a 2-way “figure 8” cable and terminal block facilitates the connection to 

the DATA network via a multi-drop bus (daisy chain connection).  For further information of installation of 

a Zoneworks system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl. DATA 

version) 

 

DALI EM Option

 

Luminaires with part numbers having 

-DALI 

are fitted with DALI modules (nodes) that facilitate connection 

and integration to 3

rd

 Party Lighting Control Systems.  Before installing the -DALI fitting please confirm 

that the Lighting Control System has the capability to monitor DALI Emergency Luminaires.  The -DALI 

fitting will be addressed and configured into the control system by the Lighting Control System 

Commissioning Technicians and not Clevertronics.   

State

 

LED Operation

 

Commissioned/ Un-commissioned  LED on Solid (Green) 
Emergency Light Test in progress  LED flashes at 1s On (red & green) & 1s Off 
“IDENTIFY COMMAND” 

Fitting goes into emergency mode for 10 seconds 

A 2-way “figure 8” cable and terminal block facilitates the connection to the DALI network OR a 5/6way 

“structured wiring system” lead and plug facilitating the power and DALI connection.  DALI connections 

are marked as Da Da.  

 

 

CLP™ 

Circular Emergency Light

 

Installation & Maintenance Instruction Leaflet

 

 

 

NOTE: Standard product codes with this symbol 

are enabled with Clevertest Plus capability.  

Please refer to the operation guide supplied with 

the product for details.

 

Australia (Head Office) 

Website: www.clevertronics.com.au 

Email: [email protected] 

Phone: +61 3 9559 2700  

Fax: +61 3 9559 2799

 

 

UK OFFICE 

362 Stockley Close 

West Drayton UB7 9BL 

Phone: 01895 430 255 

 

 

 

 

 

Models:  

 

 

CCIRC-yy-xx

 

Testing: 

 

 

 

Options:

 

 

Manual Test 

 

xx = Blank   

DALI Driver 

 

vv = DD

 

Zoneworks

 

xx = ZW 

 

 

 

Z/W DATA  

 

xx = DATA   

 

 

DALI Registered.     

 

xx = DALI   

 

 

Hive 

xx = HVG     

 

 

 

 

 

 

 

 

Spare Parts:  

1550230

 

BATT:LP 3.2V 6400mAh.200mm lead.Brkt.

 

8002801

 

PCA: CLE 220mm 2500lm 840 ADV4 EM SO

 

1330041

 

LED Driver - Set to 380mA

 

UKM02370110001 

UKM02870060001 

CLIFE-CKIT-IC1-650 

CLIFE-CKIT-HVG-IC1-650 

 

 

Important:

 

It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before installation, 

ensure that the electricity supply has been switched off and isolated. Installation must be carried out in 

accordance with the relevant British Standards.

 

 

 

 

 

 

Reviews: