background image

1942842 

V1.0  

8 June 2021 

UK Instruction Sheet Template – V1.1 – Updated: 20/11/2020 

Clevertest and Clevertest Plus 

 

Refer to the supplementary operation guide supplied with the Product. 

After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red 

flashing for a period up to 2 minutes.

 

Maintained fittings (CBULKM-xx) cannot be scanned with a camera using the Clevertest Plus App as the 

maintained light source interferes with the camera scanning function. To register the fitting manually 

enter the serial number from the QR code and visually read the test result and enter manually into 

Clevertest Plus App.

 

Zoneworks, HIVE and DATA Monitored Options

 

Fittings with part numbers -ZW

,  -HVG,  -DATA 

are fitted with Zoneworks communications modules 

(nodes). These fittings are monitored using either Powerline Carrier Technology that utilize the power 

cable to provide data communication, RF transceiver modules operating in the ISM band or a dedicated 

data cable to/from data routers installed on a dedicated data trunk connected to a central Server (can also 

be connected via Ethernet/Internet/Fibre). Zoneworks software on the server is used to monitor, 

coordinate testing and collate test data from each fitting. Zoneworks Fittings can be commissioned by a 

single push of the test switch or by scanning the supplied barcode. The LED Test Switch indicator provides 

a multifunction indication of the status of the fitting during testing and normal operation: 

Option 

State 

LED Operation 

ZW, HVG, DATA  Commissioned 

LED on Solid (Green) 

ZW, DATA 

Un-commissioned 

Batt plugged-in:

 yellow 1s, green 1s 

Batt unplugged:

 red 1s, off 1s 

HVG 

Un-commissioned 

With network connectivity 

Batt plugged-in:

 yellow 1s, green 1s 

Batt unplugged:

 red 1s, off 1s 

HVG 

Un-commissioned 

Without network connectivity 

Batt plugged-in:

 yellow 250mS, green 

250mS, yellow 250mS, green 250mS, 

green 1s 

Batt unplugged:

 red 250mS, off 

250mS, red 250mS,off 250mS, off 1s 

ZW, DATA 

Emergency Light Test In Progress 

LED flashes at yellow 5s , 0ff 1s 

HVG 

Emergency Light Test In Progress 

LED flashes at yellow 1s , 0ff 1s 

 

In the case of the DATA version a 2-way “figure 8” cable and terminal block facilitates the connection to 

the DATA network via a multi-drop bus (daisy chain connection).  For further information of installation of 

a Zoneworks system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl. DATA 

version)  

DALI EM Option

 

Luminaires with part numbers having -DALI  are fitted with DALI modules (nodes) that facilitate 

connection and integration to 3rd Party Lighting Control Systems.  Before installing the -DALI fitting 

please confirm that the Lighting Control System has the capability to monitor DALI Emergency 

Luminaires.  The -DALI fitting will be addressed and configured into the control system by the Lighting 

Control System Commissioning Technicians and not Clevertronics 

State

 

LED Operation

 

Commissioned/ Un-commissioned  LED on Solid (Green) 
Emergency Light Test in progress  LED flashes at 1s On (Yellow) & 1s Off 
“IDENTIFY COMMAND” 

Fitting goes into emergency mode for 10 seconds 

A 2-way “figure 8” cable and terminal block facilitates the connection to the DALI network OR a 

5/6way “structured wiring system” lead and plug facilitating the power and DALI connection.  DALI 

connections are marked as Da Da. 

Note: 

This luminaire (with reinforced insulation between control/LED terminal and AC supply) contains non-

user replaceable light source and battery - to be replaced (if required, refer installation instructions for 

battery replacement) by Clevertronics service personnel/agents or a registered electrician.

 

 

 

 

LED Emergency Bulklite 

Installation & Maintenance Instruction Leaflet

 

 

 

Australia (Head Office) 

Website: 

www.clevertronics.com.au

 

Email: [email protected] 

Phone: +61 3 9559 2700  

Fax: +61 3 9559 2799

 

 

UK OFFICE 

Website: 

www.clevertronics.co.uk

 

362 Stockley Close 

West Drayton UB7 9BL 

Phone: 01895 430 255 

NOTE: Standard product codes with this symbol        are 

enabled with Clevertest Plus capability.  Please refer to the 

operation guide supplied with the product for details. 

 

   

   

   IP65

 

Models:  

 

 

CBULKy-xx

 

Testing: 

 

 

 

Options:

 

 

Manual Test 

 

xx = Blank 

 

 

Non-Maintained 

y=Blank 

Zoneworks

 

xx = ZW 

 

 

Maintained 

y=M 

Z/W DATA  

 

xx = DATA 

 

 

 

 

Zoneworks HIVE

 

xx = HVG

 

 

 

 

 

DALI Registered.     

 

xx = DALI 

 

 

 

 

 

Spare Parts:

 

8050790 

HWSUB: CT10754-D2 LED Strip - 2835 LP/L10 

8002964 

PCA: CT10142-L9 6C150 CTP DALI HVG ZW 250mA Batt 

1550231 

BATT:LP 3.2V 6400mAh.200mm lead, No Brkt 

 

 

 

 

Important:

 

It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before installation, 

ensure that the electricity supply has been switched off and isolated. Installation must be carried out in 

accordance with the relevant British Standards. 

 

Caution:

 

On many building sites, power circuits may be cut off in an uncontrolled and repetitive basis during 

construction. As a result, any Exit & Emergency Units, on these circuits, will have their batteries discharged 

or “cycled”. The Li-ion battery in the Exit & Emergency Unit has been selected to give excellent long life 

performance in a controlled IEC 60598-2-22 testing environment. Excessive battery cycling will reduce 

through-life performance and may lead to premature battery failure. Battery warranty claims, as a result 

of such abuse, are specifically EXCLUDED from Clevertronics warranty terms. 

 

 

 

 

 

Reviews: