18/20 Duerdin St
Tel: +61 3 9017 6688
Clayton VIC 3168, Australia
Fax: +61 3 9017 6668
www.clenergy.com.au
Email: [email protected]
3.
Installation Process
3.1 Installing the single Truss Support
3.1.1 Unfold the folded
Truss support then Bolt the
enforcement tube to the
bottom of the back leg.
Fasten the bolts and nuts
pre-assembled to secure the
structure.
3.1.2 Connect the front and
rear legs to the bolts pre-
installed on the ground or
screw the legs using anchor
screws.
3.1.3 Make sure the other
connections on the
components are tighten.