3.1.1
Solution 1
(30°-45°)
Step 1:
unfold pre-assembled
support as shown in
Figure 2;
Step 2:
Fasten the M12*100
bolts from Al Tube and H
Joint first, thenrotate L
anchor plate and S
anchor plate in order to
keep them in a same
line, as shown as Fig. 5.
Solution 2:
(25°)
Step 1:
unfold pre-assembled
support as shown in
Figure 2;
Step 2:
Fasten the M12*100
bolts from Al Tube and H
Joint first, then rotate L
anchor plate and S
anchor plate in order to
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 1
NOTE: The screw
heads have to keep in
a same direction