background image

 

 

1

 /

18 

No. 999-1009, Min’an Avenue, Xiang’an                                                                                                     1/10 Duerdin , 

Xiamen China 361006                                                                                                                             Clayton VIC 3168 

Tel: +86-592-5781288                                                                                                                      Tel: +61-3-90176688 

Fax: +86-592-5782298                                                                                                                    Fax: +61-3-90176668 

Email: 

[email protected]

                                                                                              Email: 

[email protected]

 

Website: 

www.clenergy.com.cn

                                                                                            Website: ww2w.clenergy.com.au

 

1. Product Introduction 

 

Clenergy PV-ezRack

®

 SolarTerrace

 Eco (hereinafter referred to as ST Eco) is a pre-assembled 

ground PV-Module mounting system, which is suitable for large-scale commercial installation and 

multi-purpose installation.ST Eco has been developed as a mounting system for various PV-

module. Innovative and unique ST Eco's M module groove track is convenient and help to 

improve the installation precision. Using high quality engineered components SolarTerrace Eco 

more suitable for areas with higher salinity, and saves developers and installers, time and money 

when delivering large scale projects. 

 

Before system installation, please read the installation instruction manual carefully. The manual 

provides the following content: (1) simple introduction of installation; (2) product installation 

specification; 

 

Please use it according to the installation instruction manual, which complies with GB50009-2012

JIS 8955-2017

ASCE7-10

ISO 14713 and other building codes. Please pay attention to safety 

when installing the product, and construct it according to local laws and regulations. You can 

confirm the latest installation instruction manual on www.clenergy.com.cn if necessary.  

 

Installation personnel shall conform to the following specifications

 

 

Conform to all local or national construction specifications that can replace the manual

  

 

Guarantee that Clenergy rack products are applicable to specific installation and 

installation environment

 

 

Please use Clenergy’s accessories and your installation tools. (Our company does not 

undertake any responsibility for other accessories that replace Clenergy’s ones)

 

 

Recycle according to local related laws

 

 

Disassembly is corresponding to installation steps

 

 

The number of solar plate installation personnel shall be not less than 2

 

 

Guarantee that installation of electric equipment is finished by professional electricians.  

Summary of Contents for PV-ezRack SolarTerrace Eco with TM Rail

Page 1: ...dated on 2018 04 PV ezRack SolarTerrace Eco with TM Rail Installation Guide V1 1 NO PZ02A IM03 11 Content 1 Product Introduction 1 2 Tools Components 2 3 System Overview 6 4 Installation Instructions...

Page 2: ...y The manual provides the following content 1 simple introduction of installation 2 product installation specification Please use it according to the installation instruction manual which complies wit...

Page 3: ...www clenergy com cn Website ww2w clenergy com au 2 Tools Components 2 1 Tools Tools Allen Key 6mm M8 Hexagon Socket Screw Socket Wrench M8 M12 Torque Wrench Electric Drill 5m Tape Marker String Total...

Page 4: ...ICII M Inter Clamp II R TM90 L TM Rail SP LS90 M Splice for TM Rail S STEco W Support Pre assembled W shape ER AA 50 3560 8 Angle AL CO RT 55 50 Connector for Rectangular Tube GS xx Ground Screw ER HB...

Page 5: ...l to fasteners prior tightening to avoid galling or seizing in the threads 2 General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force uniformly to maintain...

Page 6: ...86 592 5781288 Tel 61 3 90176688 Fax 86 592 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website ww2w clenergy com au Notes Tighten th...

Page 7: ...clenergy com au Website www clenergy com cn Website ww2w clenergy com au 3 System Overview 3 1 Composition 1 End Clamp with M module 2 Inter Clamp II with M module 3 TM Rail 4 Splice for LS Rail 5 Pr...

Page 8: ...92 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website ww2w clenergy com au 3 2 Installation Planning Note Specific size refers to pro...

Page 9: ...information such as piling depth column span etc If you have any questions please contact and consult the customer service 4 1 2 According to the installation planning use Total station or any instrum...

Page 10: ...all aligned 4 2 2 To different engineer there are 3 types of Pre assembled Support W shape Before installation it looks as shown Figure3 Unfold the Rectangular Tubes as shown in Figure 4 Unlock the M...

Page 11: ...au N shape Before installation it looks as shown Figure7 Unfold the Rectangular Tubes as shown in Figure8 Unlock the M12 85 Bolt from the free end Rectangular Tubes and insert it into the Slot U Shape...

Page 12: ...efore installation it looks as shown Figure11 Unfold the Rectangular Tubes as shown in Figure12 Unlock the M12 85 Bolt from the Slot U Shape Joint Insert the free end Rectangular Tube into the Slot U...

Page 13: ...om au 4 2 3 Put the unfolded Pre assembled Support on frank plates of Ground Screws and lock the L anchor Plates with frank plates with M16 bolts The up down adjustable range of Front Rear leg is 20mm...

Page 14: ...ions to install other Pre assembled Support Ensure all the Two Groove Square Girders of Pre assembled Support are aligned and all Pre assembled Support are parallel to each other Unlock M16 50 or M12...

Page 15: ...e positions of all East West Adjustable Brackets and fasten with M8 Bolts assembly Recommend Torque for Bolts M8 18 20 N m Figure19 4 4 Rail Installation 4 4 1 Before fix TM Rails on the Support splic...

Page 16: ...ne lower side of TM Rail on the East West Adjustable Bracket and fasten with Rail Clamp And fasten the other lower side of TM Rail with Rail Clamp as shown in Figure 21 4 4 3 Place the TM Rail one by...

Page 17: ...tly lock Connector for Rectangular Tube on the rear leg of Support as shown in Figure 23 Insert M8 30 through the hole on Angel AL Lightly lock another Connector for Rectangular Tube on the next span...

Page 18: ...tion 4 6 1 Tilt the Clamps with M module and click the lower side of M module into the channel of the Rail first then press the other side of M module into the channel as shown in Figure25 4 6 2 It is...

Page 19: ...pen as shown in the figure26 4 6 3 Fix the rest of PV Module according to the sequence from low to up from left to right Make the side faces of PV Module tightly against Clamps as shown in Figure27 An...

Reviews: