REF: CL-10127-S
Internal REF: 00140
8. Footing depths are for reference only. The characteristics of the soil must be checked
on site by a technical expert. A soil report assessment is always recommended and
Clenergy must be informed on the outcome of the soil report.
Construction is to be carried out strictly on accordance with the instruction manual. This work
was designed in accordance with the provisions of Australian Building Regulations and in
accordance with sound, widely accepted engineering principles.
Should you have any queries, do not hesitate to contact us.
Best Regards,
Alberto Escobar
Civil/Structural Engineer
BEng MIEAust NER
BRP EC 46542
RPEQ 18759