
Tornado
P1
Mini
Bowser
Tornado
P4
Mini
Bowser
Engine
Honda
GX120
Engine
Honda
GX
340
11HP
360rpm
Pump
RSV
3G25D
Pump
AR
RK
Ͳ
15.20H
Pressure
1500
PSI
Pressure
2900psi
/
200Bar
Flow
9lpm
Flow
15
lp,
/
3.3gpm
HP
Nozzle
25045
HP
Nozzle
2505
Gearbox
None
Gearbox
2:1
reduction
Unloader
Integrated
Unloader
Gymatic
3B
ARGM3B250
Pump
Oil
10W/40
Pump
Oil
10W/40
Gearbox
Oil
N/a
Gearbox
Oil
EP90
Noise
Tornado
P2
Mini
Bowser
Tornado
D70/ES
Engine
Honda
GX200
Engine
Yanmar
L70
Pump
AR
XT13
Ͳ
12
Pump
ARXT13.12
Pressure
2200
PSI
Pressure
2900PSI
Flow
13
lpm
Flow
13
lpm
/
3.3gpm
HP
Nozzle
25045
HP
Nozzle
2505
Gearbox
2:1
Reduction
Gearbox
2:1
Reduction
Unloader
ARMM4B
Unloader
ARGM3B250
Pump
Oil
10W/40
Pump
Oil
10W/40
Gearbox
Oil
EP90
Gearbox
Oil
EP90
Noise
Tornado
Electron
Motor
24v
DC
HP
Nozzle
15045
Pump
ARXT11
Ͳ
14
Unloader
ARMM4B/C
Pressure
1200
PSI
Flow
11
lpm
Pump
Oil
10W/40
Battery
2
x
140
amp/hour
AGM
Sealed
Batteries
Microprocessor
Controlled
Automatic
Battery
Charger
24Volt
12.5
AMP
Technical
Specifications
Important—New
P2
Machines
Each
new
P2
machine
will
be
set
at
2000psi
as
opposed
to
2200psi
until
the
machine
has
been
run
for
approx
2
Ͳ
3
hours
continuously.
Once
the
machine
has
been
run
then
the
pressure
can
be
adjusted
to
achieve
the
maximum
2200psi
by
turning
the
pressure
regulating
valve
until
its
fully
open.