The bands used for lifting the machine up must have the same loading capacity as
the machine load. Handling operations must be done without causing a loss of
stability of the machine. Otherwise, the machine can be damaged or the operator
can do in danger.
FIORENTINI suggest to use authorized personnel (see § 2.3.) to handle the machine.
LOADING SYSTEM
4.2.
STORAGE
The machine must be stored in a closed and dry place if not immediately installed in order to keep every part
safe.
Relative humidity must be lower than 80% and the storage temperature must be between 3°C
≤
t
≤
+ 45 °C .
4.3.
HOW TO UNPACK THE MACHINE
Cut the straps paying attention to the back spring;
Remove the staples that join the paperboard and the pallet;
If the package is mad of plywood, please remove the staples from each side;
Cut the straps that fix the machine;
Lay the machine on the floor.
4.4
HOW TO HANDLE THE UNPACKED MACHINE
Check the machine and install the batteries if not already installed;
For a brief transport of the machine, please disconnect the batteries cables and remove brushes and
squeegee; for a longer transport, please use the original package of the machine.