2123b_1_5_en_ bedingt.fm, 03.07.2014
P2119BA/EN 2014-06
9
Before initial operation
4
3.2
Options
4
Before initial operation
4.1
Air supply
Make sure that the pressure before the pressure regulator is at least 0.5 bar higher than the required
inlet air pressure at the tool.
Keep the inside of the air hose free of residue; clean it if necessary.
Air quality
In accordance with ISO 8573-1, quality class 2.4.3, compressed air must be dry and clean.
Air preparation units
Our recommendation: air preparation units (filters, regulators, lubricators) should be installed
5
Connection for evaluation electronics TVP100
6
Start button
7
Reserve oil adjustment, see 6.2 Fill reserve oil, page 16
8
Suspension bail
9
Hex wrench (WAF 2), order no. 935490
Order no. 934918
Signal connection kit
for evaluation elec-
tronics TVP100
Protective sleeve
Order No. 937447PT – 7PTHH…
Order No. 937442PT – 7PTHHA…
Parameter
Data
Air hose
Inner diameter 3/8" (ø 9.5 mm), maximum length 5 m
Air inlet
1/4" NPT, inner diameter
7.5 mm
Parameter
Data
Working pressure range
400 … 700 kPa
Max. dew point
+ 10° C
Device
Explanation
Filter
Retention of particles > 15 micrometers.
Removes more than 90% of condensation.
Regulator
To attain constant work results, the working pressure must be
kept constant for every individual tool.
Item
.
Designation