PREPARE MAIN COVER
Gather the Parts
•
Ratchet (1" 4000LB) (6) (#QH1061)
•
Pipe 1.315"x75" Swaged (4) (#131S075)
•
Pipe 1.315"x73.5" Plain (2) (#131P0735)
•
Cover 10x08x18 12.5oz Green Skylight
(#QC02000R4NL)
•
Tek Screws (#FA4482B)
Assembly Procedure
1. Fasten a ratchet to the end conduit with a Tek
screw in the bottom hole of the ratchet as shown
in Figure 15. The ratchet should be about 6" in
from the end of the conduit. Repeat this step in
all four corners.
Figure 15.
Fastening Ratchet to End Conduit
2. On one side of the shelter, identify the two rafters
where you will install side ratchets. Side ratchets are
typically evenly spaced along the frame.
3. Fasten ratchets to the outside of these rafters using
a Tek screw about 2" from the bottom of the rafters
as shown in Figure 16.
NOTE:
The ratchets are installed on only one side of the
shelter because this model uses D-ring straps (installed
later) on the opposite side of the shelter.
Figure 16.
Fastening Ratchets to Rafters
4. Assemble two 18' cover conduits. Start each conduit
assembly with one plain pipe and add swaged pipes
to arrive at the correct length. Secure each pipe joint
with a Tek screw and wrap the joint with duct tape.
! CAUTION:
To prevent damage, do not install main
cover on a windy day.
5. Unpack the main cover and unfold it completely with
the inside surface facing up.
6. Locate the cover ends with strapping and align with
the front and back of the shelter.
7. Slide cover conduits into hem openings as shown in
Figure 17.
Figure 17.
Sliding Cover Conduits into Hem Openings
NOTE:
Shelter shown above may be a different length
than your model.
Cover
Ends with
Strapping
Cover
Conduits
E
ND
P
ANEL
E
ND
C
ONDUIT
Visit www.ClearSpan.com for additional products and customer assistance.
9 of 12