
23
Revision date: 07.11.14
Install Ribbon Board
Photo below shows the installed ribbon board and the installed baseboard on a sample frame.
Photos above show Part 1 of a ribbon board attached
to the side of a frame. Example shows using 2" screws
(additional purchase) to secure board to rafters. Screw
heads are countersunk below board surface to allow for
the installation of the 102197 u-channel and Part 2 of the
ribbon board. Customer-supplied exterior grade carriage
bolts are also an option for fasteners.
Finished grade up
to bottom of ribbon
board is 72".
Finished Grade
Ribbon Board
(Part 1)
Ribbon Board
Baseboard