
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
4
WaveSmart Circulator
Installation Manual
_________________________________________________________
Manual 013299 Rev C - Oct 2019
5.
6.
7.
8.
9.
Test and verify signal performance is as expected via Link Loss Budget analysis. Remove or add attenuators as
needed to maintain proper power margin.
Upon successful completion of Step # 5, manually switch the Network Element to “Protect” and verify valid switch via
PM (Performance Monitoring) analysis.
Upon successful completion of Step # 6, perform steps 3-5 as above applied to the TX (Working) and RX (Working)
fiber pair.
Upon successful completion of Step # 7 and verification that the “Working” path is properly operating via PM Analy
-
sis, manually switch live traffic back to “Working” and retest via PM one last time. Insure that all alarms clear and that
traffic is operating normally.
(Optional) Insert a Near End QRSS (Quasi Random Signal Source) VT/STS (Virtual Tributary/Synchronous Trans
-
port Signal) level simulated traffic hard loop at the far end and then monitor the BER during exercise, and/or force a
manually switch to “Protect” to re-confirm proper operation.
WaveSmart
Circulators
(Dual/Quad)
1310nm WBO or
1550nm WBO
WaveSmart
Circulators
(Dual/Quad)
1310nm WBO or
1550nm WBO
Working Bi-di
Protect Bi-di
FTTH BLC/OLT/
Sonet OC-n or
Carrier Ethernet
Node
FTTH BLC/OLT/
Sonet OC-n or
Carrier Ethernet
Node
Working
XMT
RCV
Working
RCV
XMT
Protect
XMT
RCV
Protect
RCV
XMT
Location “A”
Location “Z”