User-Supplied Items
Supply the following items for cabinet installation.
Tools
Bring the following tools to the installation site:
• Power drill with universal socket and screwdriver bit sets
• Hammer drill with bit set
•
Socket wrench/nut driver set (standard)
•
Box wrench set (standard)
•
Screwdriver set (standard)
• Beam Level
• Insulated needle-nose pliers
• Wire stripper
• Wire cutters
• Crimp tool
• Compression crimping tool
• Fiber cleaver
• Fiber splicer
• Modular MS2 or 710 splicing tool
• RB Razor-Sharp Cutting Edge knife, or another similar tool
•
Wire brush (to clean drill hole for a 1/2-13 inch hole concrete insert)
Materials
Bring the following materials to the installation site:
• Leveling shims
• Silicone sealant
•
Two-hole compression ground lug #2-6 AWG, 3/4-inch spacing (for earth ground wire)
• MS2 or 710 connectors for copper line splicing
• Strain relief for #6-8 AWG wiring
•
(4) 1/2-13 inch concrete inserts (for EXM installations)
•
River stone rock (to fill EXM riser outside plant cable entry location)
• Plastic sheeting
Equipment
Bring the following equipment to the installation site:
• Digital multi-meter
• Optical power meter
• Digital multi-function test set