2. Identify up to 3 optimal panels to use for wiring into the ClearEnergy Docking Station to charge
theClearEnergy ClearPOWER P2.
3. Using MC4 connectors and Y Branch connector to split the + and – leads from each solar panel before the
micro-inverter and/or optimizer.
4. Attach the + and – leads to the relay box.
5. Using approved methods bring #10 AWG wire from the ClearEnergy RelayBox to the installed 4 Square Box
dedicated to the ClearEnergy DockingStation.
6. Run outside rated #18 AWG (signal wires) from the ClearEnergy RelayBox to the 4 Square box dedicated to
the ClearEnergy DockingStation.
7. Connect solar wires in the RelayBox and junction box.
8. Connect the signal wires in the RelayBox and in the Junction Box.
9. Re-install plates and re-mount solar panels
10. Test
Tool
Appearance
Description
Multimeter
Used to check cabinet insulation
and cable connection, and
measure electronic performance
specifications of a device, such as
voltage, current, and resistance.
Label paper
Used to prepare labels.
Insulated phillips screwdriver (2
mm x 150 mm and 3 mm x 250
mm)
Used to tighten screws and bolts.
Insulated socket wrench
Used to tighten bolts and nuts.