CleanCraft ADSG 15 Operating Instructions Manual Download Page 11

Technical Data

ADSG 15 | Version 1.03

11

4

Technical Data

4.1 Table

4.2 Type plate 

Fig. 14: Type plate 

5

Transport, Packaging, Sto-
rage

5.1 Delivery and transport

Delivery

Check the battery-operated pressure sprayer for visible 
transport damage after delivery. If you discover any da-
mage to the battery-operated pressure sprayer, please 
report this immediately to the transport company or the 
retailer.

Transport

 

Improper transport of single devices, packed or unpac-
ked non-secured devices that are stacked on top of each 
other or next to each other is liable to accidents and can 
cause damage or malfunctions for which we do not pro-
vide liability or guarantee.

Transport the scope of delivery secured against shifting 
or tilting to the place of installation with a sufficiently di-
mensioned industrial truck. 

Transport may only be carried out by authorized and 
qualified persons.

5.2 Packaging

All packaging materials and packaging aids used for the 
Battery-operated pressure sprayer are recyclable and 
must always be returned for material recycling.

Shredded packaging components should be disposed of 
in the waste paper container.

The foils are made of polyethylene (PE) and the padded 
parts of polystyrene (PS). These materials can be han-
ded in at a recycling collection depot or to your local wa-
ste disposal company.

5.3 Storage

Store the battery-operated pressure sprayer in a dry, 
clean and frost-free environment.

Data

ADSG 15

Length (product) ca.

344 mm

Width/Depth (product) ca. 

241 mm

Height (product) ca.

486 mm

Weight (net) ca. 

4,3 kg

Supply voltage

18 V

Current type

DC

Working pressure 

1,2 - 4,5 bar

Working pressure (max)

4,5 bar

Pump pressure 

3,2 - 4,6 bar

Pump pressure (max)

6,5 bar

Delivery rate (max) 

126 l/min

Working capacity 

48 - 90 l/min

Inlet temperature 

40 °C

Sound pressure level

63,4 dB(A)

Sound power level

75 dB(A)

Engine speed 

2100 rpm

Protection class

Charger II / Device III

Engine insulation class

A

Total current consumption 

0,8 A

Tank 15 

Liter

High-pressure hose length 

1,7 m

Battery capacity 

2 Ah

Operating time 

2 - 3 h

Charging time 

ca. 5 h

ATTENTION!

Danger of injury due to objects falling over or off the 
forklift, pallet truck or transport vehicle. 
Only use transportation equipment and load slings 
that can carry the total weight. 

Summary of Contents for ADSG 15

Page 1: ...Battery operated pressure sprayer ADSG 15 Operating Instructions ADSG 15...

Page 2: ...1 3 Limitation of liability 3 2 Safety 3 2 1 Symbol explanation 3 2 2 Obligations of the operating company 4 2 3 Requirements to staff 4 2 4 Personal protective equipment 5 2 5 General safety regulati...

Page 3: ...aluable experience and knowledge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes...

Page 4: ...must provide the necessary protec tive equipment to the staff and order the use of the necessary protective equipment in a binding way Furthermore the operating company is responsible to keep the the...

Page 5: ...Please contact our cus tomer service for the execution of all arising work 2 4 Personal protective equipment The personal protective equipment serves to protect per sons against impairments of safety...

Page 6: ...eas immediately with clean water If swallowed drink water or warm salt water to induce vomiting and consult a doctor as soon as possible Fig 3 Consult a doctor if inhaled spray fog Keep the spray sol...

Page 7: ...device unattended The battery pressure sprayer may only be used in the range of temperature from 0 C to 45 C Fig 8 Maintain operating temperature Test the pressure sprayer with water before use to av...

Page 8: ...ieved Fig 11 Observe mixing ratio Change clothes after use and wash all parts of the body thoroughly with soap and water Take a shower if necessary Fig 12 Shower after application ATTENTION Do not use...

Page 9: ...ction to the 220 volt mains supply Notes on operation 2 6 Safety data sheets Safety data sheets on hazardous materials can be obtai ned from your specialist dealer or by calling 49 0 951 96555 0 Speci...

Page 10: ...pregnating or desin fection agents paints or varnishes glazes lipids mine ral oils and synthesised oils may be sprayed The device is not intended for commercial use The pres sure sprayer is approved f...

Page 11: ...eturned for material recycling Shredded packaging components should be disposed of in the waste paper container The foils are made of polyethylene PE and the padded parts of polystyrene PS These mater...

Page 12: ...arness Battery pressure sprayer Instruction manual 7 Accessories Battery 18V 4 0 Ah Item number 7013547 Charger 2 0 A Item number 7013548 Spray gun Item number 7360000 Lance Item number 736001 High pr...

Page 13: ...ep 5 Test the battery pressure sprayer at first with wa ter before adding chemicals Fig 20 8 Fig 20 Functional test with water Step 6 Press the Power button on the device Fig 21 8 Fig 21 Switch ON the...

Page 14: ...th the liquid Step 4 Hold the pistol grip firmly in both hands and be considered that spraying will cause a kickback Step 5 Press the trigger on the spray gun to start spray ing Activate the red lock...

Page 15: ...er supply immediately and contact your dealer The O ring and washer are wearing parts The frequency of replacement depends on the time of use the sprays used and regular cleaning of the pressure spray...

Page 16: ...only through the designated and appro ved methods 11 1 Take out of service Worn out devices must be immediately taken out of ser vice in a professional way in order to avoid later misuse and to avoid...

Page 17: ...device Example The pump for the battery operated pressure sprayer has to be ordered The pump has the number 24 in the spare parts drawing 1 When ordering spare parts send a copy of the spare parts dra...

Page 18: ...8 ADSG 15 Version 1 03 Spare Parts 12 2 Spare Parts Drawing The following drawing should help to identify the necessary spare parts in case of service Spare parts drawing 1 Fig 26 Spare parts drawing...

Page 19: ...wer part tank 1 12 Circuit board 1 13 Circuit board EVA label 2 14 Plug connection component 1 15 Seam sealing 1 16 Switch 1 17 Base housing 1 18 Screw 5 19 Back board 1 20 Screw 2 21 Hook for lance 1...

Page 20: ...g diagram 13 Electrical wiring diagram Fig 27 Electrical wiring diagram 36 Spray gun 1 37 Conical nozzle 1 38 Flat blower nozzle 1 39 Double holed nozzle 1 40 Adjustable shower nozzle 1 Position Desig...

Page 21: ...d environmental requirements DIN EN 19932 2 2013 Equipment for crop protection Knapsack sprayers Part 2 Test methods DIN EN ISO 12100 2010 Safety of machinery General principles for design Risk assess...

Page 22: ...www cleancraft de...

Reviews: