
PBX Dosing Cabinet Manual Page 5 of 13
Updated: 03/25/21
USER MANUAL: PBX-CAB-DOS
READ ALL INSTRUCTIONS BEFORE OPERATING EQUIPMENT
Rail Mounting
1. To install the Pump Cabinet on a wall mounted rail
(sold separately) attach the rail to the wall using
appropriate hardware (not included).
2.
Attach the Pump Cabinet to the rail by hooking
the rail supports to the top edge of the rail at a
slight angle. [Figure 4.1].
3. Let the cabinet rotate back onto the rail and rest
against the wall to secure in place [Figure 4.2].
4.
Position the Pump Cabinet on the rail with
clearance for hose routing and additional pump
cabinets or boxes.
Fig. 4.1:
Mounting Cabinet to rail (shown with PBX-RAIL-M)
Fig. 4.2:
PBX Cabinet attached to rail
Mounting Requirements (continued)