Clay Paky C71085 Instruction Manual Download Page 16

SHOW-BATTEN 100 - 100 AS

16

Periodic cleaning

- Fig. 10

To ensure optimal operation and performance for a long time it is essential to periodically clean the parts subject to dust and grease deposits. The
frequency with which the following operations are to be carried out depends on various factors such as wear and the work environment quality (air
humidity, dust, salinity, etc.). To remove dirt from external parts, use a soft cloth dampened with any liquid glass cleaning detergent.
It  is  recommended  that  the  projector  undergoes  an  annual  service  by  a  qualified  technician  for  special  maintenance  involving  at  least  the  following
operations:
• General cleaning of internal parts.
• General visual check of internal parts, cabling, mechanical parts, etc.
• Electrical, photometric and functional checks; eventual repairs.

Cleaning transparent cover

Only use neutral soap and water to clean the transparent cover then dry it carefully with a soft, non-abrasive cloth. (WARNING: the use of alcohol or
any other detergent could damage the transparent cover.

10

Parts requiring frequent cleaning.

Summary of Contents for C71085

Page 1: ...erviced correctly and safely CLAY PAKY S p A disclaims all liability for damage to the fitting or to the other property or persons deriving from installation use and maintenance that have not been car...

Page 2: ...y lines of the projectors from indirect contact and or shorting to earth by using appropriately sized residual current devices Connection to the power mains A qualified electrician must perform connec...

Page 3: ...0 AS COME OTTENERE LE INFORMAZIONI DI SICUREZZA NELLA VERSIONE MULTILINGUE Puoi sempre scaricare la versione multilingue delle Informazioni di Sicurezza per questo prodotto Clay Paky al seguente link...

Page 4: ...4 SHOW BATTEN 100 100 AS UNPACKING AND PREPARATION 2 x 183102 805 2 x 183102 805 REMOVAL OF THE PROTECTIVE FILM 1 1 2 INSTALLATION AND START UP 3 Packing content Fig 1...

Page 5: ...g on specific rubber feet on a truss on the ceiling or wall WARNING the safety chain must be installed except when the projector rests on the floor Code 105015 801 available upon request This must be...

Page 6: ...ne cable or other cable with characteristics differing from those specified End connections must be made using XLR type 3 pin male female connectors A terminating plug must be inserted on the last pro...

Page 7: ...is condition occurs any modified value that has not yet been confirmed with the A key will be cancelled 8 see pag 12 Button functions Menu SET If pressed in idle status Cyclically switches between idl...

Page 8: ...8 SHOW BATTEN 100 100 AS MENU SETTING...

Page 9: ...9 SHOW BATTEN 100 100 AS Continued...

Page 10: ...10 SHOW BATTEN 100 100 AS...

Page 11: ...11 SHOW BATTEN 100 100 AS Continued...

Page 12: ...12 SHOW BATTEN 100 100 AS...

Page 13: ...13 SHOW BATTEN 100 100 AS Continued...

Page 14: ...14 SHOW BATTEN 100 100 AS...

Page 15: ...1 2 Fuses 6 3x32mm 2A T p n 030472 MAINTENANCE 15 SHOW BATTEN 100 100 AS 9 Fuses replacing Fig 9 Each Show Batten has 2 fuses associated with the main power cord connection Continued...

Page 16: ...with any liquid glass cleaning detergent It is recommended that the projector undergoes an annual service by a qualified technician for special maintenance involving at least the following operations...

Page 17: ...5 6 3 7 11 Battery removal Fig 11 This product contains a rechargeable lithium iron tetraphosphate battery To preserve the environment please dispose the battery at the end of its life according to t...

Page 18: ...verheating Automatic derating in case of LED overheating or failed operation of cooling system Cooling Forced ventilation with fans and heat sink Body Body extruded in black anodized aluminum Aluminum...

Page 19: ...LED burnt out or defective Signal transmission cable faulty or disconnected Incorrect addressing Fault in the electronic circuits Optic fault Dust or grease deposits Check the power supply voltage Cal...

Page 20: ...CHANNEL LIST SHOW BATTEN 100 20 SHOW BATTEN 100 100 AS...

Page 21: ...21 SHOW BATTEN 100 100 AS CHANNEL FUNCTIONS Continued...

Page 22: ...22 SHOW BATTEN 100 100 AS...

Page 23: ...23 SHOW BATTEN 100 100 AS Continued...

Page 24: ...24 SHOW BATTEN 100 100 AS...

Page 25: ...25 SHOW BATTEN 100 100 AS...

Page 26: ...26 SHOW BATTEN 100 100 AS LED 1 LED 2 LED 3 LED 4 LED 5 LED 6 LED 7 LED 8 LED 9 LED 10 SHOW BATTEN 100 LED reference number for pixel mapping...

Page 27: ...CLAY PAKY S p A Via Pastrengo 3 b 24068 Seriate BG Italy Tel 39 035 654311 Fax 39 035 301876 www claypaky it IST007 001 EN Rev A 01 2016...

Reviews: