Clavia DMI
Service manual Nord Modular G2 rev. 1.2
Page 6
Testing the G2 Engine
In order to run the test program on a G2 Engine, you have to connect a G2 panel board.
This does not allow the G2 Engine to be run as a full G2/G2X, but is merely a way to run
the test program.
Make sure the power to the G2 Engine is turned off. Connect the panel board to the G2
Engine main board with the 26 pole ribbon connector. Press the ”hidden” update mode
button inside the hole to the right of the G2 Engine logotype and power on the synth.
The test program is now executed and should behave in the same way as if this
configuration was a full G2/G2X.
For instructions on how to use the test program, see section ”Running the test program”.
Summary of Contents for Nord Modular G2
Page 1: ...SERVICE MANUAL ...