background image

© 2020

Order #XXXXX

Assembly

Assembly Cont’d

Stacking

Unstacking

Stacking Assembly 

1) Place one horizontal frame on top of the other, lining up the

    center grooves. 
2) Turn stacking lock clockwise to tighten into place. Repeat

    for each lock.

Stacking Disassembly

1) Turn the stacking lock counter-clockwise to loosen.
2) The whole spring on the stacking lock should be in view to

    release each frame. The disengaged spring should release

    the stacking lock. If not, keep turning the stacking lock until

    it disengages.

Side-by-Side Assembly

1) Frames: Place frames side-by-side with one higher than the

    other, then slide panel down to lock panels securely together.
2) Corner Connectors: Repeat Step 1 for installing corner

    connectors to frames.

Side-by-Side

 Disassembly

1) Pull pin lock outwards to disengage.
2) Pull frames upward and apart at the same time to detatch.

Push stacking lock into the slot

of the upper frame, then spin the 

cap to tighten the lock.

Push pin lock into hole of connecting frame.

Note: Block of pin lock will secure in groove.

Disengage the stacking lock by 

spinning the cap counter

clockwise and pulling down.

Cap

Stacking

Lock

Pin Lock

Top View

Corner Connector

SEG

Grooves

Note: Orientation of Corner 

Connector may change.

Gravitee Panel Assembly

Summary of Contents for gravitee GK-2008

Page 1: ...er XXXXX Plan View Perspective View 10 20 GK 2008 10 x 20 Display If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP INST...

Page 2: ...iled explanation for assembly WARNING Cleaning Packing For Cleaning Metal Plex Laminate Parts Use a MILD NON ABRASIVE cleanser and soft cloth paper towel to clean all surfaces Keep exhibit components...

Page 3: ...y 1 Frames Place frames side by side with one higher than the other then slide panel down to lock panels securely together 2 Corner Connectors Repeat Step 1 for installing corner connectors to frames...

Page 4: ...2020 Order XXXXX 1 sq foot Grid View...

Page 5: ...nds 32 5 w x 95 h Gravitee Panel w Two 91 904 S44 94 5 h Gravitee Corner Post w Caps Both Ends 14 125 w x 95 h Gravitee Panel 94 5 h Gravitee Corner Post w Caps Both Ends 23 w x 95 h Gravitee Panel 46...

Page 6: ...2020 Step 2 of 6 Order XXXXX Top View w Caps Top View w Caps Top View Top View Top View w Caps Top View w Caps w Caps w Caps Corner Post Orientation...

Page 7: ...row side of welt with fabric to outside into the channel Repeat for other side of this corner Step 2 Repeat Step 1 for opposite corner C then insert corner B followed by corner D to complete the insta...

Page 8: ...s to panel 8 thru holes in graphic 2 Connect lights to top of display where desired See Light Connection detail Completed Assembly Slide light onto clip then lock clip into groove of horizontal extrus...

Page 9: ...el Frame 38 h Gravitee Corner Post w Door 37 0945 w Z45 Horizontal Extrusion 34 4173 h Z45 Vertical Extrusion Steps 1 Assemble Gravitee panels and posts in numerical order See Gravitee Panel Assembly...

Page 10: ...utside into the channel Repeat for other side of this corner Step 2 Repeat Step 1 for opposite corner C then insert corner B followed by corner D to complete the installation of the corners Step 3 Onc...

Reviews: